Services

Halfway Milestone Mission Tender

📄 Tender ID: 539126833 📅 Published: 21 Oct 2026

📋 Tender Overview





STFC
19 October 2026 UK scientists and engineers have reached a major production milestone in a global mission to understand why there is so much more matter than antimatter.


Half of the 137 giant neutrino sensors being built by the UK for the Deep Underground Neutrino Experiment (DUNE) in the US are now complete, marking an important step towards the experiments search for answers.
DUNE is a major international project which, once complete, will send neutrinos 1,300 kilometres across the US, in a mission to explain why the Universe is made of matter rather than antimatter.
Neutrinos may hold clues to this mystery, as well as to other fundamental questions about how our Universe works.
A UK-wide production effort
Known as Anode Plane Assemblies (APAs), these giant sensors will detect the tiny electrical signals produced when neutrinos interact with liquid argon inside DUNEs enormous underground detector.
The APAs are being manufactured by a team of 25 technicians at the Science and Technology Facilities Councils (STFC) Daresbury Laboratory, at Sci-Tech Daresbury.
They are working in close partnership with teams at universities across the UK who are contributing components, contributing to quality assurance and providing scientific leadership.
The universities are:

Lancaster University
University of Liverpool
Imperial College London
The University of Manchester
The University of Sheffield
University of Sussex

They are part of the wider DUNE-UK collaboration, which brings together 14 universities and two national laboratories, with UK scientists and engineers also contributing to detector systems, software, computing and accelerator infrastructure.
Flagship instrumentation
DUNE is one of the most ambitious particle-physics experiments ever constructed.
It will send a beam of neutrinos from Fermilab in Illinois to the Sanford Underground Research Facility in South Dakota, 1,300 kilometres away.
The APAs are the primary readout elements of DUNEs Far Detector 1, making them one of the UKs flagship instrumentation contributions to the experiment.
The UK is responsible for producing 137 of the 150 APAs required for the experiment.
Extraordinary engineering
At around 6.3 metres tall and 2.3 metres wide, each APA is roughly the height of a two-storey building and an extraordinary piece of precision engineering.
Each carries approximately 24 kilometres of hair-thin copper-beryllium wire, held in place by thousands of precision connections across its enormous frame.
When a neutrino interacts inside the liquid argon, it produces charged particles that leave behind electrical signals in the detector.
The APA wires detect those signals, allowing scientists to reconstruct what happened and study the neutrinos properties.
The completed APAs will ultimately be installed nearly a mile underground at Sanford Underground Research Facility, where DUNEs detector will contain tens of thousands of tonnes of liquid argon.
Answering fundamental questions
Neutrinos are among the most abundant particles in the Universe, but they rarely interact with matter, making them extremely difficult to detect.
By comparing the behaviour of neutrinos and antineutrinos as they travel from their source to the far detector, scientists hope DUNE will help answer some of the most fundamental questions in physics.
The experiment will investigate:

why matter dominates over antimatter in the Universe
how neutrinos behave and change as they travel
neutrinos from exploding stars, including supernovae

The depth of the underground facility will help shield the detector from cosmic rays and other background radiation that could interfere with the extremely faint signals DUNE is designed to detect.
Collaboration in action
Ian Lazarus, Head of Technology at STFCs Daresbury Laboratory, said:
Reaching the halfway point on APA production is a fantastic milestone for everyone involved.
These are exceptionally large and technically demanding detector components, and getting to this stage reflects the skill, care and teamwork that has gone into every part of the programme.
From the engineers building the APAs at Daresbury Laboratory, to the university teams supplying components, carrying out testing and providing scientific expertise, this has been a genuinely UK-wide effort.
Its exciting to see this work taking shape as part of DUNE, and to know that these detector panels will ultimately help scientists investigate some of the biggest questions about our Universe.
Looking ahead to discovery
Professor Dave Newbold, formerly executive director of National Laboratories at STFC and senior responsible officer for DUNE UK and now co-spokesperson of the DUNE collaboration said:
The APA team have accomplished a huge milestone by reaching the halfway point in their production.
The unique and complex components that are now making their way from the UK to the USA are a central component of the DUNE neutrino detector, and vital to address the ambitious scientific goals of the experiment.
Its great to know that profound questions about the universe are soon going to be answered through the efforts of workers across the UK, in industry, laboratories, and universities.
Revealing invisible particles
Together, the thousands of wires on the APAs will provide scientists with information used to reconstruct the position and movement of particles produced in neutrino interactions.
To date, eight completed APAs have arrived at Fermilab for final testing, ahead of their installation at the underground detector in South Dakota.
Halfway to completion
With half of the UKs 137 APAs now complete, work continues towards delivering all remaining assemblies to the experiment.
The remaining APAs are due to be completed by May 2029 and delivered for installation in South Dakota between November 2029.
Unlocking the mysteries of neutrinos
Justin Evans, The University of Manchester, Project lead of the DUNE-UK APA project, said:
This is a major step towards realising DU

🔍 Key Information

📄
Tender Reference No.
539126833
📅
Publication Date
21 Oct 2026
🌐
Sector
Services
📝
Notice Type
News
📍
Location
United kingdom

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 21 Oct 2026
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country United kingdom
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…