📋 Tender Overview
CALAPAN CITY, Oriental Mindoro (PIA) -- The Department of Energy (DOE), in coordination with key power sector stakeholders, completed a critical upgrade in the Calangatan Switching Station in Oriental Mindoro, enabling the full dispatch of wind power from the provinces largest renewable energy facility. The project involved installing three current transformers (CTs) at Bay 1 of the switching station, a development expected to improve electricity delivery significantly across the Mindoro grid. The installation and commissioning were undertaken in partnership with the National Transmission Corporation (TransCo), led by its president and CEO, Fortunato Atoy C. Leynes; the National Power Corporation (NPC), headed by president and CEO Jericho Jonas B. Nograles; as well as PHESI, Ormin Power Inc.; and the Oriental Mindoro Electric Cooperative (ORMECO). The upgrade addressed a long-standing limitation at the Calangatan Switching Station, which had restricted the volume of electricity transmitted to the grid. The DOE identified the issue through continuous monitoring and site inspections, observing that renewable energy output was curtailed during periods of strong wind due to equipment constraints. This limitation particularly affected the 16,530-megawatt Wind Energy Power Facility operated by PHESI, where a portion of available wind energy could not be fully dispatched despite favorable conditions. With the successful replacement, testing, and commissioning of the upgraded current transformers, the system can now accommodate the full dispatch of approximately 16 MW of wind power from the facility, maximizing renewable energy use in the island grid. PHESI also operates a Battery Energy Storage System (BESS), which helps manage fluctuations in wind generation and ensures stable power delivery. With the upgraded infrastructure, the wind facility, supported by its BESS, can now supply its full generation capacity to the grid. In a press release, the DOE said the improvement is expected to benefit electricity consumers in Oriental Mindoro through renewable energy utilization, improved power reliability, and reduced dependence on more expensive conventional energy sources, particularly during periods of strong wind. It added that it will continue working closely with TransCo, NPC, ORMECO, PHESI, and other stakeholders to address operational challenges and support the integration of renewable energy in island grids. DOE Secretary Sharon S. Garin cited the importance of strengthening grid infrastructure to support the countrys clean energy transition. Resolving grid constraints and improving system readiness are essential steps in enabling renewable energy projects to operate efficiently and contribute more meaningfully to the countrys energy supply, Garin said. She added that the successful commissioning of the Calangutan facility highlights the value of strong collaboration among government agencies, transmission operators, electric cooperatives, and private sector partners in delivering practical solutions that benefit consumers and advance the countrys renewable energy goals. (AS/PIA MIMAROPA-Oriental Mindoro/With information from DOE/Photo screengrabbed from Travel Oriental Mindoro)