📋 Tender Overview
Recovery of wells 6 and 9 guarantees the continuity of service in tourist districts and strengthens water security in the face of the rainy season.The EPS Grau managed to recover the operation of wells 6 and 9, strategic infrastructure that supplies the districts of Mancora and Los Organos, gradually reestablishing the drinking water service for the benefit of more than 55 thousand residents of the area.
This intervention is essential in Mancora and Los Organos, recognized tourist destinations in the north of the country, where the continuity of the service is essential both for the resident population and for the hotel, gastronomic and commercial activity that boosts the local economy.
The EPS also reactivated 3 pumping stations in Mancora (CBAR1, 2 and 3 Veraniego), equipment that was flooded by water and mud, and intensified work on the drinking water conduction line to conclude the progressive restoration of the service. This system suffered two breaks of 30 meters each due to landslides caused by the rains.
It should be noted that these actions, carried out in both districts, are supervised by the executive president of the Technical Agency for the Administration of Sanitation Services (OTASS), in coordination with the Ministry of Housing, Construction and Sanitation, as part of the technical support and permanent monitoring to guarantee the correct execution of the works and the continuity of the service in the jurisdiction of the providing company.
As a complementary measure, the company ordered the sending of seven tanker trucks that have been serving specific sectors while the technical work was carried out, ensuring that the supply is not interrupted during the recovery process.
Likewise, a hydrojet team was mobilized to clean the networks affected by the entry of rainwater and sediments into collectors and sub-collectors, which caused flooding and possible health problems, especially in areas with greater population and tourist concentration.
Chulucanas and vulnerable areas of Piura
In parallel, the company has been attending to contingencies in other locations in the region, such as the collapse of networks registered in Chulucanas with the support of two hydrojets, as well as preventive work in vulnerable sectors of Sullana, which has two other cleaning vehicles.
Preventive work was also carried out in Piura, specifically in the district of Veintisirse de Octubre, carried out by a hydrojet, mainly on Aleman Street in the human settlement 11 de Abril, Circunvalacion and Juan Velasco Alvarado in the II and VI sectors of the AH Nueva Esperanza, Manuel Frias in the AH Micaela Bastidas, Cesar Vallejo in the Las Mercedes Urbanization and Hawai Street in the AH Lopez Albujar.
Piura, February 27, 2026.