📋 Tender Overview
With the decolmation and channeling of the ravine, the bridge of 53.20 meters, in the rock of the banks, among others, the connectivity with 25 hamlets and districts Lalaquiz and Mustache is guaranteed.No more isolation. The regional governor, Luis Neyra Leon, inaugurated the work of repairing the bridge over the Pusmalca creek, located in the town of Chorro Blanco, a work that will benefit 5,000 settlers. This infrastructure guarantees easy and safe transitability, others will energize the economy of the district and access to basic services.
To provide long -term protection to the population, the GORE has invested 7 million 358 thousand 473 soles in this work that included the decolmation and channeling of the ravine, the structure of the 53.20 meters bridge, stabilization of banks with rivers and gabs, pedestrian accesses, signage, rain gutters and environmental protection measures.
Following precise indications of the governor of using top quality materials, with this work in charge of the Morropon Huancabamba sub region, the Gore drastically improved the court connectivity with 25 hamlets and the districts of Lalaquiz and San Juan de Bigote.
It should be noted that El Gore has executed so far on the court, in addition to the defenses of the El Limon creek and the Pusmalca bridge, the work of drinking water and sanitation of Palambla and La Paccha, transfer for the construction of the College 14477, among others, for the benefit of more than 12,000 inhabitants of the district.