📋 Tender Overview
The regional governor of Arequipa, Dr. Rohel Sanchez Sanchez, carried out unexpected inspections of various works carried out by the Regional Government of Arequipa (GRA) - both by Direct Administration and by Contract - to ensure their progress and arrange immediate actions that allow their prompt completion for the benefit of the population.
Educational infrastructure in remote areas
In the annex El Puente (Jose Maria de Quimper), verified the progress of 62.35% of the I.E. Virgen del Rosario (S/ 8.6 million), highlighting that it will provide dignified education to children in a historically neglected area.
Immediate technical corrections in Pucchun
In the I.E. Cesar Vallejo (45% progress, S/ 15.8 million), detected unjustified expenses in the perimeter fence and ordered its immediate correction, in addition to demanding to accelerate the requirements to deliver the work in the next school year. It also ordered that Logistics coordinate directly with residents to avoid cost overruns and delays.
I.E. Villa Don Jorge should be ready by 2026
In Samuel Pastor, he inspected the I.E. Villa Don Jorge that registers 62% physical progress with an investment of S/ 10.45 million. He ordered an accelerated schedule so that the work -- including equipment and furniture -- is completely ready at the beginning of the 2026 school year.
Urgent action in the I.E. Sebastian Barranca
In the Cercado de Camana, he supervised the I.E. Sebastian Barranca, which registers 14% progress with an investment of S/ 31.9 million, and established an urgent action plan that includes correcting the technical file this month and reorganizing construction into seven independent fronts to accelerate the pace of execution.
Road works to integrate the region
The governor also inspected the AR-548 Sahuani - San Gregorio highway, a strategic road that will connect Camana with Castilla, La Union and Condesuyos.
He recalled that the GRA also executes important roads such as Cayma-Cabrerias-Patahuasi, Majes-Huambo-El Pedregal and the upcoming Via del Loncco, which will decongest more than 2,500 vehicles daily.
With these interventions, the Regional Government of Arequipa promotes the timely completion of key works to improve education, connectivity and the quality of life of thousands of families in the region.