📋 Tender Overview
By government decree, approximately 650 million tenge were allocated from the reserve to complete the construction of the heat main in the city of Petropavl, North Kazakhstan region. Systematic modernization is being carried out within the framework of the tasks given by the Head of State at the joint session of the Parliament Chambers to strengthen the countrys energy and infrastructure potential. Prime Minister Olzhas Bektenov signed the relevant resolution. The funds are aimed at the construction of the heating network in the sections along Zh. Zhabaev - A. Shazhimbaev - Novaya - Y. Altynsarin streets. In 2026, 1.4 kilometers will be dismantled and new heating lines will be laid. In 2025, 0.7 km of heating lines were renewed. Thus, with the allocated funds, the repair works of highway No. 2 in the city of Petropavlovsk, with a length of more than 2 kilometers, will be completed. Implementation of the project will replace more than 80% of worn-out mains and increase reliability of heat supply to more than 30,000 city residents or more than 200 apartment buildings and social sector facilities, as well as reduce the level of wear and tear of the citys heating networks. The government is constantly monitoring the preparations for the upcoming heating season. According to the Ministry of Energy of the Republic of Kazakhstan, since 2025, 10 power units, 63 boilers and 39 turbines have been overhauled at power stations. At the same time, 17,000 kilometers of electric distribution network were renewed, 420 substations were modernized, and 323 kilometers of the most deteriorated heating network were replaced. As a result, the level of wear and tear of power plant equipment decreased to 53%, and the level of wear and tear of heating networks decreased to 50%. #Infrastructural development # Presidents assignment #Energy # Regions Be aware of the news of the Prime Minister and the Government of Kazakhstan -- subscribe to the official Telegram channel Subscription