📋 Tender Overview
With an investment of more than 15 million soles, these two road works in Tocache will improve connectivity and strengthen the agricultural economy of more than 22 thousand residents.With the firm intention of strengthening connectivity and energizing the economy of the productive areas of the region, the Regional Government of San Martin (Goresam), through the Special Huallaga Central and Bajo Mayo Project (PEHCBM), simultaneously restarted two road works in the province of Tocache: the paving of the Sarita Colonia - San Agustin de Huaquisha local road and the improvement of the Nuevo Horizonte - Canuto local road, in the district of Polvora.
The restart of these projects represents a key step in the regional integration and territorial development policy promoted by Governor Walter Grundel Jimenez, who reaffirms his commitment to the continuity of investments that improve road infrastructure and raise the quality of life of thousands of rural families.
In both works, Goresam updated the technical files with the aim of optimizing construction conditions. In the case of the Sarita Colonia - San Agustin de Huaquisha road, the new file contemplates the execution of a 5-centimeter-thick hot asphalt layer and a 6.60-meter roadway, replacing the initial two-layer. With an investment of more than S/ 8 million, this 4,166 kilometer road will directly benefit more than 10 thousand residents dedicated to the production of oil palm, cocoa and coffee, emblematic products of the province.
Similarly, in the Polvora district, work on the Nuevo Horizonte - Canuto local road was restarted, whose updated technical file includes a 5-centimeter hot asphalt layer, with a 7-meter wide road and 4,135 kilometers in length, in addition to 1,441 linear meters of lined ditches, nine reinforced concrete culverts, a seven by fifteen meter speed bump and complete road signage.
This project, with an investment of more than S/ 7 million and an execution period of 180 calendar days, seeks to benefit more than 12 thousand agricultural producers, facilitating the transportation of their crops to the main markets in the region and the country.
Both works, executed by the PEHCBM, reinforce Goresams commitment to promoting sustainable regional development based on modern infrastructure, productive inclusion and the continuous improvement of the living conditions of San Martinense families.