📋 Tender Overview
The Piura Regional Government registers a physical progress of 89.66% in the Public Investment Project Improvement of the Water Service for Irrigation through the Installation of Reservoirs that is being executed in the provinces of Ayabaca, Huancabamba and Morropon. At the end of 2025, this strategic intervention allowed the completion of 1,074 reservoirs, out of a total of 1,300 reservoirs, which will directly benefit 14,051 rural users and strengthening access to water in areas of the Piura mountain range.
Thanks to this infrastructure, the irrigation of 10,682.4 agricultural hectares will be ensured, which directly impacts the production of crops such as hard corn, coffee, cocoa, mango, subtle lemon, potato, beans, wheat, barley, passion fruit, banana and cane, among others. The permanent availability of water contributes to improving field productivity and reducing the effects of periods of drought on family farming.
The project includes a comprehensive system that includes water collection, conduction line and reservoirs, which are designed with waterproof geomembrane to prevent leaks. These structures also have outlet valves, overflow systems, perimeter fencing and preventive signage, allowing the efficient use of water both for irrigating crops and for supplying livestock throughout the year.
The interventions have an investment of more than 58 million soles and are carried out in 27 districts of the provinces of Ayabaca, Huancabamba and Morropon, areas where access to water was limited. With this project, GORE Piura has been guaranteeing water for irrigation and livestock, strengthening agricultural production, improving the income of rural families and contributing to the development of communities in the interior of the region.