📋 Tender Overview
01.09.2025 Goods to the port of Gdansk will go a new track consistently increase the possibilities of transporting loads to Tri -City ports. Better capacity for freight trains going to the port of Gdansk will provide the construction of an additional track on the Pszczolka - Pruszcz Gdanski trail. Polskie Linie Kolejowe S.A. announced a tender for the design and implementation of the task from the state budget. The development of the Baltic ports is the development of the Polish economy, and the necessary factor in this process is the increase in the importance of railways in the transport of goods to the quays - their efficient delivery and reception. Further investments of PLK SA provide more efficient, safer and more ecological transport of loads, for the benefit of the environment, because more goods on the tracks are less trucks on the road. We have been able to tender the tender procedure for the design and execution of construction works for the task. Increasing the bandwidth of the Tczew - Gdynia: episode Pszczolki - Pruszcz Gdanski. As part of the task, we plan to build a fourth track on the Pszczolka - Pruszcz Gdanski trail (as track 2 of the railway line No. 260 Zajaczkowo Tczewskie - Pruszcz Gdanski). The 4-track system will improve the bandwidth on the route towards the port of Gdansk and allow frequency and agglomeration traffic from long-distance connections. This will create opportunities to prepare a better passenger offer, improve traffic conditions and better communication accessibility of the Tri -City for the rest of the country. Apart from building a new track, it also assumes reconstruction for two -way platforms No. 2 at the Skowarcz, Rozyny and Cieplewo stops. The new track together with railway traffic control devices, including the ERTMS system, will be adapted to the speed of trains up to 200 km/h Currently conducted tasks enabling access to Tri -City ports longer and heavier trains that can transport more loads. In the years 2019 - 2024 PLK SA, railway access to ports in Gdansk and Gdynia improved, allocating over PLN 3 billion net of CEF financial instrument for this purpose - combining Europe. Last year, the modernization of the railway line No. 201 Bydgoszcz - Tri -City began (from 2021 work on tangent lines lasted), which was important for the increase in the potential of the port in Gdynia. The tasks carried out by PLK SA are a response to the need to increase the transport potential on the railway line network.