Water and Sanitation

Germany Water Master Tender

📄 Tender ID: 505513274 📅 Published: 29 Jun 2024

📋 Tender Overview

The “Water Supply Master Plan” project shows the effects of climate change on the water balance. The project’s analysis shows the municipalities of nine districts how their water supply will change by 2050 and provides recommendations for action.

Climate change is already having a noticeable impact on water supplies. These will become more severe in the coming years and decades. The Ministry of the Environment and the Ministry of Food, Rural Areas and Consumer Protection are therefore conducting a nationwide survey of the supply structure of cities and municipalities in Baden-Württemberg with the “Water Supply Master Plan” project.

The “Water Supply Master Plan” project forecasts the development of water resources up to 2050. It also estimates population growth and future drinking water demand, analyses the current supply structure and gives those responsible on site concrete recommendations on how they can prevent water shortages in the future.

Climate protection and adaptation to climate change
Environment Minister Thekla Walker said: "In addition to climate protection , adapting to climate change, which can no longer be avoided, is the order of the day. Weather and water extremes will increase. With the data from the Master Plan Water Supply project, municipalities and water suppliers can take action now and prevent water crises in the future."

Consumer Protection Minister Peter Hauk stressed: "High-quality drinking water is a basic need of our citizens. The people of Baden-Württemberg rightly expect that perfect drinking water is available in sufficient quantities at all times. As a state government, we want and must meet this requirement. With the 'Water Supply Master Plan' project, we are laying the foundation for ensuring that our drinking water supply remains secure in the future."

Water supply of 235 cities and municipalities analyzed
After a data collection phase lasting around a year, the results of the second batch are now being handed over to the municipalities involved. This second wave analyses the water supply of 235 towns and municipalities in nine districts: Schwäbisch Hall, Hohenlohekreis, Neckar-Odenwald-Kreis, Freudenstadt, Rottweil, Zollernalbkreis, Sigmaringen, Emmendingen and Ortenaukreis.

The presentations of the results started on June 18, 2024 for the municipalities in the Emmendingen district and on June 19 for the municipalities in the Sigmaringen and Zollernalb districts.

The analysis shows that security of supply is currently fundamentally ensured. In almost all supply areas, the average demand can be fully covered.

However, climate forecasts for the period up to 2050 show that in some parts of the country up to 20 percent less groundwater will be recharged. In summer, a significant increase in temperature, longer dry periods and more frequent extreme weather events such as heavy rain are to be expected. These changes will lead to an increased demand for water in agriculture and in public water supplies.

Need for action in 20 percent of municipalities
In 20 percent of the municipalities examined, there is therefore a need for action with a view to 2050. The recommendations for the responsible municipalities and public water supply companies range from adjusting the procurement rights of a special-purpose association to examining the possibility of tapping into previously unused local water resources and building their own corresponding infrastructure.

The analyses see an even greater need for action with regard to the so-called second pillar. This describes the possibility of maintaining the water supply if the largest water source or the largest source of supply fails. A second pillar is currently only fully available in around 20 percent of supply areas. By 2050, this figure will fall to less than ten percent if no measures are taken.

Water supply data
The data on water supply that will be included in the “Water Supply Master Plan” project will be collected and evaluated for each municipality in the entire state of Baden-Württemberg using a uniform methodology and with the involvement of engineering firms. The project is scheduled to run for five years.

🔍 Key Information

📄
Tender Reference No.
505513274
📅
Publication Date
29 Jun 2024
🌐
Sector
Water and Sanitation
📝
Notice Type
News
📍
Location
Germany

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 29 Jun 2024
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Germany
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…