📋 Tender Overview
Deutsche Bahn DB plans for the Offenburg tunnel are progressing. In order to gain insights for detailed planning DB measured the Burgerwaldsee in the south of Offenburg this week. The east tube of the Offenburg tunnel is to be undercut by around 130 meters of the Burgerwaldsee. As part of the expansion and new KarlsruheBasel line the tunnel will be used for freight traffic in the future which will make it significantly quieter for the residents.The bottom of the Burgerwaldsee the so-called lake bottom was measured from the surface of the water. With the method used it is possible to precisely determine not only the height of the lake bed but also the layers of the water bottom. Information was collected on the formation composition and properties of the lake bed.The first exploration program in Offenburg started back in 2017. It gave the planners an insight into the subsoil and the groundwater conditions. The railway is now examining the ground conditions in the Offenburg area along the future tunnel route in much more detail. The approval process for the tunnel begins in the summer. Two information events for the public on July 19 and 21 mark the start.