📋 Tender Overview
The district of Bad Kissingen invests in improving traffic conditions and receives support for this from the Free State of Bavaria. Transport Minister Christian Bernreiter has now promised funding from the Free State of Bavaria for the expansion of the KG 18 district road between the districts of Hassenbach and Schlimpfhof in Oberthulba With the expansion of the district road the Bad Kissingen district is significantly improving the traffic conditions at this point. I am particularly pleased that the new footpath and cycle path will improve traffic safety especially for pedestrians and cyclists. We are happy to support this and are putting more than 1.1 million euros into our hands.The current expansion status of the KG 18 district road between Hassenbach and Schlimpfhof no longer meets the requirements of current and future traffic conditions. The district of Bad Kissingen has therefore decided to widen the road between the two districts over a length of around 720 meters and to smooth out the existing right-hand bend in the direction of Hassenbach. At the same time a new pedestrian and cycle path alongside the road will be built which will be connected to the existing network of pedestrian and cycle paths at both ends. The spatial alignment of the street improved by the construction work and the future separation of pedestrian and bicycle traffic from motorized traffic will significantly improve traffic safety in this area. The total cost of the expansion is almost two million euros.All in all districts cities and municipalities in Bavaria receive around 250 million euros from the Free State every year for projects to improve their road networks. In addition to strengthening roadways and bridges this also includes for example the construction of cycle paths the traffic-safe conversion of intersections or the construction of bus lanes.