📋 Tender Overview
A replacement building for surgery will be built at the University Medical Center Freiburg. After the Ministry of Finance has given planning approval the responsible Freiburg office of the Baden-Wrttemberg State Office for Assets and Construction will commission an architecture office and other specialist planners. We all want optimal medical care based on the latest science research and technology for a lifetime. It is not always enough to renovate existing buildings in order to equip them structurally and structurally. A replacement building is needed in Freiburg said Finance Minister Edith Sitzmann. This will enable us to create the best possible conditions for high-performance university medicine and modern patient care.Like the medical clinic and the gynecological clinic surgery has so far been housed in the ring-shaped Lorenzring. The listed Lorenzring from the beginning of the 20th century has to be completely renovated. In the future its structural structures will only permit use for rooms that do not require high-tech equipment. The central operating room which is now 35 years old is also no longer up to date. All high-level functions should therefore be concentrated mainly in new buildings. According to the master plan the location for the replacement surgery building is in construction site II east of Lorenzring and north of the new interdisciplinary tumor center. The space program for the replacement building has already been developed in detail in a feasibility study. It envisages a six-story compact building. On an area of around 27500 square meters 24 operating theaters 76 intensive care beds 256 normal care beds outpatient departments and an operative day clinic with an outpatient operating theater are to be accommodated. A modern central sterilization facility and a goods supply center complete the space program. Digital instruments are to be used in the planning in particular so-called Building Information Modeling BIM. An interdisciplinary exact three-dimensional digital building model is created with which construction and operating costs can be traced. The planning period is four to five years. 36 million euros are available for planning and preparatory measures. The funds come from the redevelopment offensive for the four university hospitals in the state with which the state parliament of Baden-Wrttemberg has provided planning funds for key projects of central importance. The renovation offensive for renovation and maintenance measures in university medicine has a total volume of 500 million euros.