📋 Tender Overview
From Sunday September 19 to Sunday October 17 bridge work will take place in the Neckarsulm area from 10.35 p.m. to 4 a.m. the following day. For this reason the section between Neckarsulm and Heilbronn Hbf via Heilbronn Slmertor must be closed to rail traffic.This has an impact on a connection on the AVG line S42 which otherwise runs regularly from Neckarsulm departure 0.52 a.m. via the Heilbronn Slmertor stop. The affected train on line S42 is diverted from Neckarsulm and travels via the Heilbronn Harmonie stop to the Heilbronn Hbf Willy-Brandt-Platz stop.The diverted train S42 85839 departs on the nights mentioned in Neckarsulm differently from platform 5 previously platform 4.As a substitute for the Heilbronn Slmertor stop scheduled at 0.56 a.m. the Heilbronn Technisches Schulzentrum stop 1.02 a.m. can be used distance approx. 350 meters five minutes walk. The train ends at 1.12 a.m. in Heilbronn at the station forecourt Hauptbahnhof Willy-Brandt-Platz.