Building

Germany Expansion High Tender

📄 Tender ID: 479035090 📅 Published: 07 Oct 2022

📋 Tender Overview

The high-tech campus GrohadernMartinsried of the Ludwig-Maximilians-University Munich is one of the largest centers in Europe in which basic scientific research teaching clinical research and technological innovation are brought together. With the construction of two new buildings for research into cardiovascular diseases ICON - Interfaculty Center for Endocrine and Cardiovascular Disease Network Modeling and Clinical Transfer and for diagnostics for bacteriology and virology DIAG of the Max von Pettenkofer Institute for the before Exactly one year since the foundation stones were laid this unique science location is now being further strengthened. Despite all the difficulties caused by the tense global situation which also has an impact on the construction industry construction work is progressing rapidly.Bernreiter together with the Vice President of the LMU for Economics and Human Resources Dr. Christoph Mlke the medical director of the Munich University Hospital Prof. Dr. Markus M. Lerch and Thomas Kaner the responsible division manager of the Munich State Building Authority celebrate the topping-out ceremony.In his speech Minister of Construction Bernreiter thanked everyone involved in the construction My heartfelt thanks go to everyone who with their commitment contributes to meeting the ambitious schedule despite the difficult situation. In times like these this cannot be taken for granted. The high-tech campus is excellently complemented by the two lighthouse projects ICON and DIAG and Bavaria as a medical location is further strengthened. Bernreiter also emphasized the performance of the Munich 2 State Building Authority which has taken on the project management and oversees the construction measures.Science Minister Markus Blume Bavaria is building for and on cutting-edge medicine With ICON and DIAG we create top conditions for research into new treatment and diagnostic methods. Research is the foundation for the best possible medical care. Research saves livesTop research requires state-of-the-art facilities and the two new buildings of the LMU that are now being built on the high-tech campus are an outstanding example of the pioneering cooperation between the Medical Faculty of the LMU and the LMU Klinikum between research and patient care emphasizes dr Christoph Mlke LMU Vice President for Economics and Human Resources. We are therefore very pleased that the Free State of Bavaria and the federal government are jointly financing these research buildings at the LMU. This will further strengthen our high-tech campus in GroadernMartinsried as an international research location.Medical Director Prof. Dr. Markus M. Lerch In the field of cardiovascular research the LMU Klinikum and the LMU are really leaders. The federal government has therefore decided to fund this research building of national importance with 50 of the construction costs after a highly competitive process. Here in the near future the latest techniques and procedures that really matter to patients will be tested and reviewed before being put into practice.The two new buildings share a construction site on the site of the research campus in Grohadern and will essentially be erected at the same time which poses an additional challenge for the construction work on the already highly complex research buildings. Thanks to the outstanding planning performance of the State Building Authority and the architects however it was possible to use the limited space optimally and thus to realize the projects extremely economically and space-efficiently.In the new ICON LMU new preventive diagnostic and therapeutic strategies against cardiovascular diseases will be developed on almost 7000 square meters of floor space. A total of almost 50 million euros will be invested in the building which will be shared between the Free State of Bavaria and the federal government. The ICON is the sixth research project at the LMU and the fourth at the GrohadernMartinsried site to receive federal funding. Completion is scheduled for the end of 2024. The construction work on the neighboring diagnostics building is to be completed a year earlier. On a good 5500 square meters this will unite the previously spatially separate facilities of the Chairs of Medical Microbiology and Virology. In addition to laboratories and offices there will also be a diagnostics line and rooms for vaccination advice. The Free State is investing a further 32 million euros in total for the DIAG.A uniform facade design with the same material will underline the unity of the two new buildings. In addition their energy standard and the priority use of regenerative energies should be particularly emphasized.

🔍 Key Information

📄
Tender Reference No.
479035090
📅
Publication Date
07 Oct 2022
🌐
Sector
Building
📝
Notice Type
News
📍
Location
Germany

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 07 Oct 2022
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Germany
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…