📋 Tender Overview
As part of the four-track expansion of the Rhine Valley Railway Deutsche Bahn DB is building a modern station and a new rail infrastructure in Mllheim. For the two additional tracks DB also has to renew bridges north and south of Mllheim station. The DB is replacing the existing road bridge on federal highway B 378 with a completely new structure.In order for the DB to be able to construct the new building and fill up the associated road embankment the B 378 will be temporarily swung to the south in the areas in front of and behind the existing bridge. The new course of the road will then be reconnected to the existing structure on both sides. A full closure of the B 378 from Monday December 5th to Thursday December 22nd 2022 is necessary for this work. The diversions are via Kreisstrae 4946 and the Richtberg crossing and are signposted.After the pivoting and reconnection the B 378 can be driven on in two lanes again. The federal road swings southwest via a section of Aumastrasse in Mllheim which will remain closed in this area until the end of 2023.DB apologizes for the longer distances and the resulting inconvenience.