📋 Tender Overview
As part of the four-track expansion of the Rhine Valley Railway Deutsche Bahn DB is building a modern station and a new rail infrastructure in Mllheim.For the two additional tracks DB also has to renew bridges north and south of Mllheim station. Among other things DB is replacing the existing road bridge on federal highway 378 with a new structure.The Renkenrunsstrae in the area of the bridge has to be closed for the new building which is being built parallel to the main road and the embankment of the new road embankment. The lockdown will start on Monday September 26 2022 and will last until mid-2024.The diversions especially to Breisgau compost and to the recycling center are signposted. DB apologizes for the longer distances and the resulting inconvenience.