📋 Tender Overview
In the context of rising domestic energy demand and the world market continuing to fluctuate unpredictably, Vietnam Gas Corporation (PV GAS), a member unit of the Vietnam National Energy-Industry Group (Petrovietnam), has received nearly 120,000 tons of LNG and LPG, and proactively arranged hundreds of thousands of tons of fuel for the following months. On June 7, 2026, the ship METHANE MICKIE HARPER transported about 73,000 tons of LNG from Canada and arrived at LNG Thi Vai port. This is one of the large-scale LNG shipments received by PV GAS in 2026, contributing to adding clean fuel sources to serve gas power plants. Download The ship METHANE MICKIE HARPER transporting about 73,000 tons of LNG from Canada has docked at Thi Vai LNG port - Photo: VGP/LT According to the plan, the next LNG trip is expected to arrive at the port on June 17 - 18, 2026 with a volume of about 15,000 tons of LNG from Australia. PV GAS is also promoting supplier selection procedures for the LNG shipment expected to be delivered in early July 2026, serving PV Powers needs, thereby continuing to strengthen the fuel source for the domestic gas power system. At the same time, the CLIPPER WILMA ship also docked to Vietnam to bring about 45,000 tons of LPG imported from the United States. This source of goods contributes to strengthening storage capacity, while ensuring a stable supply of LPG for the civil, commercial and industrial sectors during a period of increasing demand. The volume of imported LPG arranged for June and July 2026 is about 140,000 tons (including refrigerated LPG and pressurized LPG), along with domestic production ensuring to meet all domestic customer needs as well as the LPG business system under the Petrovietnam Gas brand nationwide. Simultaneously receiving large-scale LNG and LPG shipments in the context of increasing energy demand shows PV GASs ability to forecast the market, proactively source goods and flexibly operate in ensuring national energy security, meeting consumption demand during peak months. Download The ship CLIPPER WILMA also docked at the port, bringing about 45,000 tons of LPG imported from the United States to Vietnam - Photo: VGP/LT To realize the proactive supply strategy, PV GAS simultaneously promoted the efficiency of the modern energy infrastructure system that has been invested in for many years, including Thi Vai LNG Warehouse and large-scale cold LPG storage warehouses. This is an important foundation to help businesses improve their capacity to receive, store and distribute clean energy products, meeting the increasing requirements of the market in the context of a strong energy transition. With the total volume of imported LNG in the first 6 months of 2026 reaching about 354,000 tons and more than 140,000 tons of LPG arranged for the coming months, combined with domestically produced gas and LPG sources, PV GAS Ensuring sufficient supply to serve electricity production, industry and peoples needs. These efforts not only affirm PV GASs operating capacity and leading energy focal point position but also demonstrate its commitment to accompany the Government and Petrovietnam in ensuring national energy security, contributing to market stability and promoting sustainable economic growth. Le Thanh