📋 Tender Overview
News Nieuwslesse before 4 June 2025 Average reading time: {time} Minute average reading time: {time} minutes the renewal of the hills system on Kijfhoek has been completed. All traces are again in use to hill freight wagons. The hills system has been completely renewed at Kijfhoek in the past two years. All distribution tracks have been replaced from the drainage to the rails and calamity roads have been installed. The infrastructure is now ready to be able to hills again at least the next 15 years. To realize the commitment after two years many people from ProRail contractors Siemens Dura Vermeer and their subcontractors and carrier DB Cargo worked hard. All work took place on a relatively limited space with a high safety level on the site. Kijfhoek is the largest goods yard in Europe. Goods from the Dutch ports are distributed here over various trains (Heuveld) so that they can be transported to their destination that can be throughout Europe. With the renewed digital hills system Kijfhoek is again fully operational after a period of two years. Read more Read Meermeer about: Freight transport Kijfhoek Emplacement More New Trein Traffic resumed after demonstration at Havenpoorlijn 9 April 2025prorail wants substantial investments in rail freight transport 2 April 2025 decrease freight transport by rail. Coal transport 4 February 2025 Are you satisfied with the information on this page? Yes No What can we do to improve the information? Send feedback thank you SpoorwerkCwoon or do you work within 300 meters from the track? Then use our railway work. You can immediately see which work is planned in your neighborhood. PostcodeDit field is mandatory and only accepts figures and letters and no space -house numbered field is mandatory and only accepts a number of figures work