📋 Tender Overview
In the heart of Savoie in the town of Viviers-du-Lac our via teams shifted two bridge-rail structures. Drawing on our experience and our know-how in this area we carried out an emergency intervention when rail traffic was cut off. As part of an operation to secure a level crossing and after the preparatory work and the earthworks we intervened over a long weekend to slide a pedestrian structure over 26 meters for 2 hours of 160 t and a road structure of 1000 t over 30 meters in 7 hours to their final location. Our territorial network allows us to intervene in large-scale operations as well as in one-off operations.Congratulations to the teams for the work done.