📋 Tender Overview
The Pertuis bridge which separates the two harbor basins from the port of Saint-Nazaire that of Saint-Nazaire and that of Penhot has just been replaced by our teams.The 350-tonne apron manufactured in our Lauterbourg workshop measures 60 meters long by 9.30 wide and includes a secure access route for pedestrians and people with reduced mobility. The apron also allows the passage of heavy goods vehicles up to 44 tonnes.After loading on a barge from our Lauterbourg factory it went up the Rhine to Rotterdam then transhipped onto a ship with 2 cranes on board of 400 tonnes each towards Saint-Nazaire. Precision lifting operation on the previously installed 50 T swing frame. This lifting ends a year of work on the site to give way to maneuvering and commissioning tests.A very nice operation of an XXL mobile structure on behalf of the Grand Port Maritime de Nantes-Saint-Nazaire.