📋 Tender Overview
NEWNieuwslees Before April 8 2025 the first train ran on Monday morning 7 April on a brand new railway bridge at Amsterdam Central Station. A nice milestone for the project with which we prepare the station step by step for the future. In the coming years we will replace the railway bridges on the east side of Amsterdam Central. The turn of the turn of the railway bridges at the Oostert access are its end of life and must therefore be replaced. Our contractor Dura Vermeer started the first bridge last year. It is now the turn of the adjacent bridge. Of this fourth railway bridge over the Eastern access we are now installing the foundation piles and sheet piles. Do you want to watch our work? That can be done via the live stream Do you want to watch our work? This is possible via the live stream ads station Amsterdam Central Amsterdam is the gateway to Europe. The monumental station is one of the most visited stations in the Netherlands and the number of travelers continues to rise. For that reason the station must be thoroughly renovated. ProRail does not only work at the station itself but also beyond. Read more about this project Read more about this project lake about: Tunnels & Bruggen Amsterdam Centraal Meer Nieuwsmijlpaal in Heerhugowaard: Spoordek is located in its place24 March 2025Treinverkeer in Schagen from now on Stiller new diver is located in his place24 March 2025 special brick walls in Nunspeet Opendisse? Yes No What can we do to improve the information? Send feedback thank you SpoorwerkCwoon or do you work within 300 meters from the track? Then use our railway work. You can immediately see which work is planned in your neighborhood. PostcodeDit field is mandatory and only accepts figures and letters and no space -house numbered field is mandatory and only accepts a number of figures work