Railways

Findings Control Participants Tender

📄 Tender ID: 523831985 📅 Published: 14 Oct 2025

📋 Tender Overview

Between 22-28. In September 2025, joint control was held as part of the Rail Action Week; On 25 September, 34 unauthorized crossings across the tracks were recorded at the Tabor Station in Maribor (there were more real ones). Violations are common and dangerous, so they will strengthen prevention, controls and other security measures.Findings of control of participants in crossing the railway line
From 22 to 28, September 2025, a joint aggravated control, called the Week of Rail Action Week, was organized by the European Association of Railway Organizations. In the context of control, activities were carried out:
above the unauthorized or prohibited crossing of the railway line,
over crossing the railway line at level crossings (vehicles and pedestrians),
Over the prevention of damaging rail infrastructure (signals, equipment, trains, etc.) and
over violations of order and safety on trains.
Supervision in the Republic of Slovenia was carried out in cooperation with the Inspectors for Railway Transport of the Inspectorate of the Republic of Slovenia for Infrastructure and the Police, as well as representatives of Slovenian Railways, d.o.o.
On September 25, 2025, the railway inspectors attended a joint tight control at the Tabor railway station in Maribor, from 1.30pm to 3pm. The main focus of control was on the illicit or prohibited crossing of the railway line (walking across the rail tracks).
In the context of the control, 34 cases of unauthorized crossings of the railway line were recorded by walking across the tracks.
Most violations were found in:
walking or crossing the tracks from the Tabor railway station in Maribor and
walking or crossing the tracks through a violently removed protective fence, which is intended to prevent such passages.
A total of 34 violations were recorded, and the actual number of unauthorized crossings was significantly higher, because their volume of all violators could not be stopped and recorded.
Supervision showed that a violation of the ban on walking across the railway lines is still very common, and even in cases where safe passages are located in the immediate vicinity. Crossing the tracks during train runs was also detected, which poses an extremely high risk of peoples safety.
Based on the findings, railway inspectors will strengthen preventive activities and controls, and take additional measures to increase safety and reduce illicit crossings of the railway line.
1 /2

🔍 Key Information

📄
Tender Reference No.
523831985
📅
Publication Date
14 Oct 2025
🌐
Sector
Railways
📝
Notice Type
News
📍
Location
Slovenia

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 20 Oct 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Slovenia
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…