📋 Tender Overview
The first advance of the new road corridor will integrate mass transport systems in Lima.The Municipality of Lima, through the Municipal Company to Support Strategic Projects (EMAPE), reported that the paving in both directions of the first section of the express road Grau and the Lucanian Jiron and the Lucanian Jiron. Currently, the concrete emptying is being executed in the section that goes from Lucanas to Huanuco, while the shoes and pillars of two of the four new metropolitan stations are built.
This megaproject will mark a milestone in urban mobility, since for the first time the two most modern massive public transport systems in Lima will join, allowing a direct tour from Carabayllo to Villa El Salvador. With this, thousands of citizens can move from north to south, in the city more quickly, safely and economically.
The work includes the construction of rigid concrete pavement from the Grau Square to the Jiron Junin, in addition to the milling and asphalting of the auxiliary roads in the stretch of Lucanas to Junin. A modern Semaforization System will also be implemented to optimize vehicular circulation.
With the interconnection of these transport systems, Lima will significantly reduce their travel times. Currently, the tour from Lima Norte to Lima Sur can exceed the hour and a half; However, with the new route and the integration of the Metropolitan, this journey can be made in just 45 minutes, improving the quality of life of thousands of users daily.