📋 Tender Overview
National Power Transmission Corporation (EVNNPT) and Power Transmission Company 4 (PTC4) in coordination with related units have just implemented the construction of two key power transmission projects in Vinh Long province Download Units carry out the construction implementation ceremony of the project to Increase capacity of 220 kV Tra Vinh Substation - Photo: EVNNPT These are projects: Increasing capacity of transformer station (TBA) 220 kV Tra Vinh and 2 220 kV Mo Cay substations. The two projects are invested by EVNNPT, and Power Transmission Company 4 is assigned to manage and operate. When completed, the projects will contribute to improving power transmission capacity, increasing operational reliability of the power system, meeting the load development needs of the locality and surrounding areas. For the project of increasing the capacity of Tra Vinh 220 kV substation, the project is implemented within the existing station campus in Ba Se A hamlet, Song Loc commune, Vinh Long province. The project has the scale of replacing the AT2 220/110/22 kV transformer with a capacity of 125MVA with a transformer with a capacity of 250MVA, increasing the total capacity of the station from 375MVA to 500MVA. Besides replacing the transformer, the project also equips a new protective relay system, synchronizing the control and monitoring system to improve the ability to coordinate protection and operate safely and reliably. trust. The project is expected to be completed and put into operation in November 2026, contributing to meeting N-1 operating criteria, increasing the ability to supply power to 220 kV substations in Vinh Long province and surrounding areas. For the Mo Cay 220kV 220kV Substation project, the project is built on the campus of the existing Mo Cay 220kV substation in Mo Cay commune, Vinh Long province. RELATED NEWSEVNNPT proposes to remove bottlenecks and speed up power transmission projects in Quang NinhEVNNPT and ADB appraise ODA funding for the 500kV Binh Dinh - Krong Buk line projectEVNNPT energizes 2 projects to enhance electricity security for Tay Ninh province and Dong Nai cityThe project will install a new second transformer with a capacity of 250MVA, add feeders on the 220kV side and 110 kV with synchronous control and protection system. Once completed, the Mo Cay 220kV substation will have its capacity increased from 125MVA to 375MVA. The project is expected to be completed in the fourth quarter of 2026. Once completed, it will contribute to enhancing the power supply capacity for 110kV substations in the area, supporting the power supply to the Vinh Long 220kV substation, meeting N-1 operating criteria and improving supply reliability. Power Transmission Company 4s leadership representative emphasized that both projects are important in improving power transmission capacity, meeting the load development needs of Vinh Long province and neighboring areas, and contributing to ensuring the safe, stable and continuous operation of the power transmission system. PTC4 leaders require contractors to mobilize maximum human resources, facilities, organize scientific construction, strictly comply with regulations on safety, quality and progress to complete projects as planned. Representatives of units participating in the project also commit to promote the sense of responsibility, enhance coordination during the construction process, ensure project quality and put projects into operation on schedule, promote investment efficiency, and contribute to meeting economic development needs. - society of Vinh Long province and the region. Toan Thang