Energy, Power and Electrical

Evnnpt Safe Continuous Tender

📄 Tender ID: 522818640 📅 Published: 16 Sep 2025

📋 Tender Overview

This is one of the outstanding results of the National Power Transmission Corporation (EVNNPT) achieved in the first 8 months of 2025. In 8 months of 2025, EVNNPT has safe, continuous electricity transmission of 171.5 billion kWh electricity - Photo: VGP/ToanEnNPT said that the transmission output of the Corporation in August 2024 reached 23.48 billion KWH, an increase of 3.02% in the same period. In 8 months of May 2025, the transmission output was made more than 171.5 billion kWh, an increase of 2.81% compared to the same period in the first 8 months of 2024, equal to 63.73% of the plan for the whole year 2025. According to EVNNPT, August and the first 8 months of the year the basic transmission grid operates safely, providing stable, continuous electricity, the number of incidents decreases over the same period last year. (including 12 500 kV mesh projects; 21 220 kV grid projects and 1 110 kV grid project). Related news only in August 2025, EVNNPT started 5 projects including: 500 kV Hai Phong - Thai Binh line; 220kV Than Uyen Line - Lao Cai 500 kV TBA; 500 kV Binh Duong line 1 - Chon Thanh; 220 kV Hong Ngu - Chau Doc line; Install the second 220kV transformer TBA 220 kV Can Duoc. In 8 months, EVNNPT has started 23 projects. Regarding the electricity plan, EVN assigned EVNNPT to energize 64 projects (of which: 500 kV mesh 14 projects; 220 kV grid 47 projects; 110 kV net 3 projects). In addition, EVNNPT assigns 10 more projects. In August 2025, the Corporation energized 3 works, namely the project to raise the capacity of 500 kV Viet Tri TBA; Van Ninh 220 kV transformer station and connection line; Increase the power of 2 MBA 220 kV TBA 500 kV O Mon. Accumulated electric construction works in the first 8 months of 2025 EVNNPT had 18 energizing works.EVNNPT said that in September 2025 in operation management, power supply and production and business activities, the Corporation will strengthen the management of transmission grid operation to minimize incidents and ensure safe, continuous and stable electricity supply. Ensure electricity output of high value, ensuring revenue. Focus on reviewing solutions to minimize electricity losses (TTDN) to fulfill the EVN planning target. Promote the progress of large repair and periodic repair to ensure the quality of equipment on the transmission grid. Directing the cross -line work, especially the North -South Expressway. In construction investment, EVNNPT will focus on accelerating the plan to deploy the work of making and submitting a feasibility research report to design technical design to meet the schedule and plan. At the same time, starting and energizing many key-photo projects: VGP/Winning with that, focusing on accelerating the implementation of investment preparation and investing in construction investment projects, ensuring the plan on construction investment volume and disbursement as planned .. at the same time accelerate the progress, start construction, power the projects as planned. Focus on directing the progress of key projects according to the Prime Ministers electricity. All

🔍 Key Information

📄
Tender Reference No.
522818640
📅
Publication Date
16 Sep 2025
🌐
Sector
Energy, Power and Electrical
📝
Notice Type
News
📍
Location
Viet nam

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 16 Sep 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Viet nam
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…