📋 Tender Overview
Create maximum conditions for customers to install rooftop solar power for self-production and self-consumption; accelerate the progress of installing energy storage systems (BESS); Making the most of domestic fuel sources... are synchronous solutions that have been and are being implemented by Vietnam Electricity Group (EVN) to ensure electricity supply for 2026, especially in the approaching dry season peak months. Download To ensure electricity supply for 2026, EVN has been implementing a series of solutions. According to EVNs report, in the first 2 months of this year, the total electricity production and import of the entire system reached over 48.2 billion kWh, an increase of 7.09% over the same period in 2025. Commercial electricity output of the whole Group reached 43.5 billion kWh, an increase of 8.46%. Also in the first 2 months, the heat Coal power continues to play a leading role with mobilized output accounting for 50.97% of total source output, followed by hydropower 22.37%, renewable energy 15.75%, gas thermal power 6.85%, imported 4.05%. The hydrological situation at the beginning of the year is considered quite favorable. The total remaining electricity in the lakes by the end of February 2026 is estimated to be equivalent to 11.5 billion kWh. Regarding fuel for electricity production, thermal power plants are basically guaranteed to keep coal inventories higher than EVN norms; Gas and oil fuels also basically meet the systems mobilization requirements. However, it is predicted that this years heat may appear earlier and last longer than last year, and water shortages may occur, as the La Nina phenomenon will gradually weaken in the first half of this year and then switch to El Nino at the end of 2026 and early 2027. To ensure electricity supply, EVN has been implementing many solutions simultaneously, including directing hydropower plants to properly regulate water sources; Thermal power plants ensure fuel and review repair schedules to avoid peak dry seasons. EVN also directed units to speed up the progress of key power grid projects, capacitor banks, energy storage system (BESS) installation, as well as solutions for load management, electricity saving and distributed power source development. EVN General Director Nguyen Anh Tuan requested relevant units to proactively coordinate with Power System Operation Company Limited and the national electricity market to plan the availability of power sources, improve accuracy in load forecasting. With units For electricity production, Mr. Nguyen Anh Tuan absolutely requires ensuring enough fuel and operational readiness of the generator set; Prepare adequate data related to the environment for the Group to propose a specific operating mechanism in case the system needs to be mobilized. Regarding the power grid, transmission units are required to soon deploy capacitors and BESS to be operational by 2027 at the latest. Group leaders also directed units to create maximum conditions for industrial parks and production and business units to install rooftop solar power for self-production and self-consumption. This is an effective saving solution for customers, while reducing pressure on the national electricity system. In particular, in the area managed by the Northern Electricity Corporation, it has been deployed very well, with the result of 2,893 customers developing this power source, reaching a total capacity of about 390MW as of the end of February.ATTRefer moreEVN ensures stable operation of the national power system during Tet.Refer moreEVN ensures safe and stable power supply during Tet Binh Ngo 2026See moreEVN signs a contract EPC of more than 25,000 billion VND for Quang Trach II LNG Thermal Power Plant. See moreEVN and FPT cooperate in digital transformation and green transformation in the electricity sector. See moreEVN signs a contract to supply main equipment for the expanded Tri An Hydropower Project