📋 Tender Overview
Vietnam Electricity Group (EVN) must prepare a very high electricity growth scenario, even up to 14% to serve the countrys economic growth goals of 8% or more in 2025. General Director of EVN Nguyen Anh Tuan chaired the Steering Committee meeting to ensure electricity supply in 2025 of the Group - Photo: VGP/ Toan ThangBan, Vietnam Electricity Supply and Supply. rank. General Director of EVN Nguyen Anh Tuan presided over the meeting. The meeting takes place in the form of direct and online connection to 22 bridges of the Corporations, Power Plants and units of EVN.For the National Electrical and Electrical Market Operation One Member Limited Company (NSMO), Mr. Nguyen Duc Ninh, General Director of NSMO.The Director of EVN Nguyen Anh Tuan emphasized that with the goal of economic growth in 2025, EVN must be at least 8%to strive for 8% The power growth is very high, even 14%. EVN leaders require EVN units to follow the Groups direction; Closely monitor the load forecast, especially focused in April, 5, 6/2025, in which regular and continuous coordination with NSMO to calculate the optimal operation plan. Regarding electricity demand, said General Director of EVN Nguyen Anh Tuan. The General Director of EVN suggested that other corporations in the Group also have ways to make both drastically and ensure timely encouragement to the affiliated units. Report on the situation of electricity supply in the first 3 months of 2025, Mr. Le Viet Hung, Head of EVN Production Technology Department, said that the units in the whole group have been implementing fully and seriously under the direction of the Government, the Ministry of Industry and Trade. General assessment, EVN and member units have guaranteed electricity supply for the socio -economic development of the country and the needs of the people. EVN thermal power plants have coordinated with TKV and Northeast Corporation to ensure adequate coal supply for the machine teams. At the same time, ensure the availableness of thermal power groups to be ready to mobilize for the national electricity system - Photo: VGP/Toan Thang in the operation, hydroelectric plants maintain reservoir water level. With coal thermal power plants, the volume of coal inventory is sufficient to meet production, and the units are well coordinated with TKV and Northeast Corporation in performing coal delivery contracts, ensuring inventory. Regarding oil and gas fuels, it is also basically meeting the needs of electricity production.In the past, EVN has organized many delegations to inspect, urge the preparation of fuel, operation, maintenance and repair, ensuring the dry season of the dry season in 2025 at the units. As noted, the units are basically ready to meet the mobilization of NSMO.