Energy, Power and Electrical

Evn Leaders Check Tender

📄 Tender ID: 521112551 📅 Published: 31 Jul 2025

📋 Tender Overview

On July 29, Mr. Pham Hong Phuong, Deputy General Director of Vietnam Electricity Group (EVN) checked the situation of the construction of the transformer station (Lao Cai TBA) and some column positions in Lao Cai province, under the Bidding Package No. 5 of the Lao Cai - Vinh Yen 500kV line project. Deputy General Director of EVN Pham Hong Phuong checked the construction progress of Lao Cai 500KV TBA, at Lao Cai 500KV TBA, by the Joint Venture of PC1 Group Joint Stock Company and Van Hoi Infrastructure Development Co., Ltd., the basic construction items were completed. Specifically, the system of cable ditches, nails columns and the most equipment has been completed and installed. According to the plan, the cutter will be transported to the construction site next week to conduct the installation. The electrical testing unit is also urgently implementing the most equipment testing at the station, ensuring all the stages of ready for operation. Up to the present time, the package No. 5 by Phuong Hanh Co., Ltd. and Dong Anh Steel Production Co., Ltd. has completed the column at 23/42 positions, 14 positions that are in the process of installation and the last 5 positions are waiting to be deployed. The contractor is expected to complete the work of the column on 42 positions before 10/8.In the position of VT240 column (Thac Ba commune, Lao Cai province), the contractor is focusing on human resources and equipment, using 200 tons crane to accelerate the installation progress. Also in this commune, VT241 has the largest steel weight of the whole route (443 tons), the work of foundation concrete has been completed. Currently, 320 tons of steel columns have been transported to the position and the contractor is expected to deploy the installation of columns in the coming days. Both VT240 and VT241 positions are located on high steep terrain, elbows, temporary construction roads creeping in the middle of the mountainside. Each heavy rain, the route is slippery, muddy, cannot be moved by conventional means of transport. Mechanical equipment and materials when transporting are facing the risk of slipping and unsafe. Deputy General Director of EVN Pham Hong Phuong checked the construction progress of package No. 5, Lao Cai province to overcome the difficulties in terrain and weather, contractors have mobilized maximum manpower, means and working overtime, taking advantage of each time of weather to transport supplies and equipment. The temporary construction routes are also urgently repaired immediately after the rain stops. In addition, the workers are arranged to stay at the construction site to maintain the continuous construction pace.The contractors are now focusing on resolving the gloves point progress, applying all measures to accelerate the construction of the 500kV line project, bringing the project to the destination in accordance with August 19 under the direction of the Prime Minister. This is a dual -circuit 500 kV line project with a total length of 229.5 km, with a total of 468 locations of electric poles. The project goes through the territory of 4 provinces including Lao Cai, Yen Bai, Phu Tho and Vinh Phuc with the first point of 500 kV Lao Cai station, the end point is 500 kV Vinh Yen station. The total investment of the project is over 7,410 billion dong. The project plays a very important role for the national electricity system to clear the capacity of hydroelectric plants in the Northwest region and the reserve of imported electricity transmission to ensure the goals of electricity supply, ensure social security in the Northern provinces in general. Anh ThoTham more examining more references

🔍 Key Information

📄
Tender Reference No.
521112551
📅
Publication Date
31 Jul 2025
🌐
Sector
Energy, Power and Electrical
📝
Notice Type
News
📍
Location
Viet nam

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 31 Jul 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Viet nam
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…