Energy, Power and Electrical

Evn Accepts Energy Tender

📄 Tender ID: 521416594 📅 Published: 08 Aug 2025

📋 Tender Overview

According to Mr. Pham Hong Phuong, Deputy General Director of Vietnam Electricity Group (EVN), up to this point, items related to the energy route serving the operation of the No. 1 unit have basically completed, meeting the design requirements and eligible for use. Mr. Pham Hong Phuong, Deputy General Director of Vietnam Electricity Group (EVN) chaired the meeting on August 6, Mr. Pham Hong Phuong, Deputy General Director of Vietnam Electricity Group (EVN), Chairman of Council for Acceptance of the Investor, chaired the construction acceptance meeting to complete the construction of works of works for energy loading of Hoa Binh Hydroelectricity Plant Project, Project Manager, Mr. Bui Phuong, Mr. Bui Phuong (EVNPMB1), Director of the Project Management Board, said the items related to the energy route serving the operation of the unit No. 1 have basically completed, meeting the design requirements and eligible for use. The items include: Water removal doors and channels, vertical wells, water tunnels, water pepper, expanded water pepper, factory (construction and equipment equipment 1) and discharge channel. The remaining items were accepted at minutes No. 381/2025/EVNPMB1-HDNTCS dated August 5, 2025, serving the energy water refill from August 5, 2025. According to Mr. Bui Phuong Nam, the construction process is implemented in accordance with the approved design, quality assurance according to technical targets. Material inspection, construction, installation, installation of equipment, testing and testing are all satisfactory; The control parameters and control experiments are all within the permitted limits, there are no abnormal signs, and some of the incomplete tasks such as: speeding system, monitoring connection, power source of hydraulic cylinder system, etc. are continuing to be completed and will be completed before August 9, 2025. These contents do not affect the safety and stability of the project during water and operate. Conclusion at the meeting, Deputy General Director of EVN Pham Hong Phuong highly appreciated the efforts of the Power Project Management Board 1, contractors, consulting units, Hoa Binh Hydroelectric Company and related parties in ensuring quality and progress of the building. Up to this point, the items related to the energy route serving the operation of the unit No. 1 have basically been completed, meeting the design requirements and eligible for use. Thereby, EVN agreed to approve the acceptance and completion of the following items: Input channel, water removal doors (except for the operation valve part 2), vertical wells, water tunnels, factories (factory construction parts and relevant equipment include: turbine machine unit No. 1, hydraulic mechanical equipment to save the factory, water pump system leakage, anti -flooding, exhaust, water supply, water supply system) The energy of the unit No. 1. Pham Hong Phuong assigned EVNPMB1 to organize the water loading of the energy gland No. 1 in accordance with the promulgated process, ensure safety and meet the technical requirements. In the process of water intake, organize monitoring, inspection, evaluation and timely handling if there are problems arising, to ensure absolute safety for the work item and related works. Urge the construction units to complete the shortcomings in accordance with the plan, organize the acceptance of existing existence, report to the Council for Acceptance of the Investor level of the implementation results. Organize the acceptance of the relevant factory equipment to load the energy gland of the unit No. 2 when eligible. Urge design consultancy, construction contractors, supervision consultancy to closely follow the construction progress to comply with the task of meeting the power generation of 2 machines in accordance with the plan.

🔍 Key Information

📄
Tender Reference No.
521416594
📅
Publication Date
08 Aug 2025
🌐
Sector
Energy, Power and Electrical
📝
Notice Type
News
📍
Location
Viet nam

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 08 Aug 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Viet nam
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…