Building

Estonia Support Round Tender

📄 Tender ID: 485595889 📅 Published: 10 Mar 2023

📋 Tender Overview

The Minister of Economic Affairs and Infrastructure today approved the conditions for energy efficiency support for apartment buildings which will distribute 80 million euros of support to apartment associations. The new round will come with updated conditions to improve the quality of housing across Estonia.According to Riina Sikkut Minister of Economic Affairs and Infrastructure this years heating season is coming to an end and it is time to think ahead to next winter. The electricity market is still changing rapidly and it is definitely worth investing in the renovation of homes and apartment buildings and in improving energy efficiency if possible. If the apartment building keeps warm well the heating costs of all households will decrease. If it is not possible for the apartment association to undertake a complete renovation it is also possible to replace the heating system with an energy-efficient one Sikkut said.The grant will finance the complete reconstruction of apartment buildings at least in energy efficiency class C. This time it is also possible to apply for a separate grant only for replacing the heating system of an apartment building with an apartment building with a renewable energy-based device or for connecting apartment buildings to a district heating network. The support can generally be requested by apartment associations of residential buildings that have been put into use until 2000. When replacing the heating system there is no time limit for the commissioning of the building.The share of the support depending on the location size of the apartment building and the work to be carried out is from 30 to 50 percent. The support rate is higher for example for smaller apartment buildings or apartment buildings in rural areas or if an elevator is also installed in the house during the renovation. A total of 80 million euros of support will be distributed in the opening call for proposals.The grant money is also a joyful message for the cooling construction market as in the coming years a total of more than 800 million euros will be invested for energy efficiency purposes Sikkut added.Initially it is possible to apply for support for a complete renovation but in the future the possibility of support for partial reconstruction will also be added. In the case of a complete renovation the faade and roof must be renovated and insulated windows must be replaced a ventilation system must be built and if there is a central heating system it must be renovated. In addition other activities related to energy saving and the deployment of renewable energy solutions will be supported such as the installation of solar panels and solar collectors for hot water production as well as the construction of electric car charging infrastructure. Among the activities supported it has been added to ensure the supply of heat in the event of a power outage creating the possibility of switching the heating unit to external power supply.Necessary activities related to the execution of works such as preparing a construction project conducting a construction survey and building audit using the service of a technical consultant and performing owners supervision are also supported.The call for proposals will be conducted by the joint institution of Enterprise Estonia and KredEx and will open in April. More information about this will be added to the KredEx website in the near future.The state has supported the renovation of apartment buildings since 2009 during which time nearly 1400 apartment associations have received funding. In 2022-2027 the state will direct at least 366 million euros which comes from the European Union Structural Funds to increasing the energy efficiency of residential buildings and improving the quality of housing. In addition to financing renovation activities the focus is on bringing new solutions to the market. Last year under the leadership of the MKM a nationwide research and development program LIFE IP BuildEST was launched the aim of which is to strengthen the ability of construction stakeholders to carry out large-scale reconstruction activities in the coming decades.

🔍 Key Information

📄
Tender Reference No.
485595889
📅
Publication Date
10 Mar 2023
🌐
Sector
Building
📝
Notice Type
News
📍
Location
Estonia

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 10 Mar 2023
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Estonia
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…