📋 Tender Overview
On May 13, with the excavation of the last meter of surrounding rock, the Qinling Jiutianshan Tunnel of the Xikang High-speed Railway was successfully completed. At this point, all the tunnels of the Xikang High-speed Railway have been completed, one step closer to opening and operating.
The new main line of Xikang High-speed Railway is about 171 kilometers long. The formations on the entire line are complex in lithology, and undesirable geological problems such as rock bursts and karst are prominent. There are 20 tunnels on the entire line, with a total length of bridges and tunnels of 161.310 kilometers, accounting for 94.41%. The Qinling Jiutianshan Tunnel is located in Shangluo City, Shaanxi Province. It is one of the full control projects. It has a total length of 13,293 meters and a maximum burial depth of about 1,200 meters. The cave body passes through 7 fault-breaking belts, making it difficult to design and construction and has high safety risks.
The project team of the construction unit China Railway First Exploration and Design Institute Group Co., Ltd. has carried out a large number of special research and targeted design work in key technologies and control factors such as online selection, engineering survey, special structural design, inclined shaft layout, and mechanized construction plans. Measures such as softening surrounding rocks, releasing ground stress and prestress anchoring are adopted for rock burst areas, and complex geological conditions such as highland stress, rock bursts, and fault zones have been successfully overcome, laying a solid foundation for the smooth completion.
Since the line crosses the Qinling area and the environmental protection requirements are extremely strict, the project team of China Railway First Academy successfully avoided important ecologically sensitive core areas along the line in the online design plan. Through the research and application of new technologies such as construction wastewater cleaning and sewage diversion and tunnel waste utilization, the ecological environment of the Qinling Mountains is fully protected, and the Xikang High-speed Railway is fully built into a green high-speed railway with technological innovation and coordinated development of the ecological environment.
It is reported that the Xikang High-speed Railway is an important part of the national eight vertical and eight horizontal high-speed railway network. It has six stations: Xian East, Taihe, Zhashui West, Zhenan West, Tongmu and Ankang West, with a designed speed of 350 kilometers per hour. After the project is completed, the operating time of the train from Xian to Ankang will be shortened from about 3 hours to less than 1 hour, which is of great significance to better meet the transportation needs from Guanzhong to southern Shaanxi, assist in rural revitalization, and promote local economic development.