Energy, Power and Electrical

Ensure Safe Stable Tender

📄 Tender ID: 521920610 📅 Published: 22 Aug 2025

📋 Tender Overview

EVNHANOI representative affirmed that the top goal is to supply safe, continuous, stable and quality electricity for the Capital during the celebration, parade, parade. During the period from 22h on August 26 to 6h on September 3, EVNHANOI will not perform power cut on high, medium, low -voltage mesh, unless there is force majeure incident. Deputy Minister of Industry and Trade Nguyen Hoang Long and the interdisciplinary delegation had an inspection of the electricity supply work on the occasion of the National Day of September 2, 20/8, Deputy Minister of Industry and Trade Nguyen Hoang Long and the interdisciplinary delegation had an inspection of the electricity supply work on the occasion of the National Day of the National Day of 9/9, attending the mission with the representative of the Ministry of Public Security and the Ministry of Defense; Leaders of some departments and departments under the Ministry of Industry and Trade, leaders of the National Power System and the National Power Market (NSMO), Vietnam Electricity Group (EVN), representatives of Ho Chi Minh City Power Corporation. Hanoi (EVNHANOI), National Power Transmission Corporation (EVNNPT) ... At the meeting, Deputy Minister of Industry and Trade Nguyen Hoang Long emphasized that the 80 -year ceremony of the August Revolution and the National Day of the Socialist Republic of Vietnam is very important, requiring all work, including electricity supply must be carefully prepared, absolutely not to make any mistakes. General Director of Evnhanoi Nguyen Anh Tuan: The Corporation has issued a plan to supply electricity, with the goal of ensuring absolute safety, continuous, stable stability, 5,167 duty accommodations to ensure that electricity reports to the delegation, General Director of EVNHANOI NGUYEN ANH TUAN said that the Corporation has issued a power supply plan with the goal of absolute safety, stability and quality of the country in the area in the days in the area. Organizing the celebration, parade, parade to celebrate the 80th anniversary of the August Revolution successfully and the National Day 2/9. During the period from 22:00 on August 26 to 6:00 on September 3, EVNHANOI will not perform power cut on high, medium, low -voltage mesh, unless there is force majeure incident, key places such as Ho Chi Minh Mausoleum, Ba Dinh Square, City Peoples Committee. Hanoi, cultural and sports agencies, the mass media are arranged with electricity from two sources of spare grid or backup generator. Particularly important places are also installed UPS systems to ensure absolute safety. The teams operating and handling incidents are arranged 24/24 hours.evnhanoi conducted inspection, review and overcome damage at underground works on 17 roads to serve the parade, parade, including Vo Chi Cong, Kim Ma, Nguyen Thai Hoc, Tran Duy Hung, Trang Tien .... For the training areas, training, and national cultural areas in Hanoi, the National Cultural Village, Hanoi, the National Cultural Village, the National Cultural Village, Hanoi National Military Training Center 4, the power source has been stable. The welcome places, international guests associations such as Presidential Palace, National Assembly Building, Party Central Office, Government Office, and many large hotels have been increased safe power supply. At the media agencies, the drilling of electricity supply has been completed with good results, ensuring no interruption when television, broadcasting events. In addition, Noi Bai and Gia Lam airports are powered from specialized transformer stations, through inspections that meet safety and stable requirements. Mr. Nguyen Anh Tuan, General Director of EVN, said: EVN requires units not to perform the work to stop and reduce electricity supply during the National Day break, there is a flexible plan to ensure electricity in all situations Nguyen Anh Tuan, General Director of EVN, said that the Group has issued a document to direct all subordinate corporations to focus on implementing electricity and political activities of 80 years of political and social activities in which, requires the units to coordinate closely with NSMO to set up, implement the plan to ensure absolute and absolutely safe and stable electricity supply during the ceremony, including activities for training, training, preliminary approval, rehearsal and celebration, parade, parade; have flexible plans to ensure electricity in all situations; Priority is given to ensuring electricity at key locations and other activities.EVN requires units that do not perform the work to stop and reduce electricity supply during the National Day break. Particularly for Hanoi City, it is necessary to ensure absolute and safe power supply for training areas, training, preliminary approvals, rehearsal and celebrations, parades, parade to celebrate the National Day. arrange forces of duty, backup equipment, communication systems and vehicles to ensure timely handling when incidents occur; coordinate with all levels of government, police, and military in the localityAce, develop and deploy security, safety and fire prevention plans for electricity works and grid management locations. Dong Vu Xuan Khu, Deputy General Director of NSMO said that the company has issued a document instructing the enhanced electricity units to ensure electricity and grid in all situations. At the same time, supplementing the sources of backup generators, electric storage systems; Assigning and arranging manpower 24/24 H during the holiday. In the event of the meeting, Deputy Minister Nguyen Hoang Long suggested that the units should continue to carefully review the options, including the backup options. It is necessary to establish operating and information coordination mechanisms between the Ministry of Industry and Trade and the electricity units and relevant units from the central to local levels. For difficulties in the movement process of the operating team, the Deputy Minister suggested NSMO and units

🔍 Key Information

📄
Tender Reference No.
521920610
📅
Publication Date
22 Aug 2025
🌐
Sector
Energy, Power and Electrical
📝
Notice Type
News
📍
Location
Viet nam

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 22 Aug 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Viet nam
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…