Energy, Power and Electrical

Energizing Increase Capacity Tender

📄 Tender ID: 526256337 📅 Published: 16 Dec 2025

📋 Tender Overview

National Power Transmission Corporation (EVNNPT), Power Transmission Project Management Board (NPTPMB) coordinated with relevant units to successfully energize the project to increase the capacity of Hoa Binh 500 kV transformer station. AT2 transformer, Hoa Binh 500 kV substation before energizing - Photo: VGP/Toan ThangThe Hoa Binh 500 kV transformer station (TBA) capacity increase project is a special level energy project, group B, invested by EVNNPT; Power Transmission Project Management Board manages and operates on behalf of the investor; Power Transmission Company 1 takes over operation. The project is carried out at the existing 500kV Hoa Binh substation, located in Tan Thinh ward, city. Hoa Binh, Hoa Binh province (old), now Hoa Binh ward, Phu Tho province. The project has an investment scale to replace 2 existing 500/220/35 kV-450 MVA transformers with 2 500/220/35 kV-900 MVA transformers, increasing the entire stations capacity by 900MVA, bringing the total capacity of the station to 1,800 MVA. Phase 1 replaced transformer AT2 from 450 MVA to 900 MVA; Phase 2 is to replace the AT1 transformer from 450 MVA to 900 MVA, expected to be completed in the next phase. In the context of the 450 MVA transformers of the Hoa Binh 500 kV substation operating at times of overload, increasing the capacity of this substation will contribute to ensuring operational safety as well as enhancing power transmission capacity from large and small hydropower sources in the Northwest region, ensuring stable power supply to Phu province. Tho, Hanoi Capital and northern provinces, especially in the context of increased load demand. RELATED NEWS This is an urgent project, playing an important role in ensuring national energy security. According to the Power Transmission Project Management Board, the project construction process faced many challenges due to construction in cramped conditions; Equipment at Hoa Binh 500kV substation is energized; Hydropower plants in the area are mobilized at maximum capacity to optimize costs, so registering for power cuts is difficult. However, with the close direction of EVNNPT, the support of dispatch levels, Power Transmission Company 1, Hoa Binh Power Transmission Team, the AT2 transformer of the 500kV Hoa Binh Substation has been successfully upgraded. The energization to increase the capacity of the AT2 transformer at the 500kV Hoa Binh Substation is a practical action of EVNNPT and NPTPMB to welcome the 7th Vietnam Electricity Trade Union Congress, term. 2025-2030; At the same time, we practically celebrate the 71st anniversary of the Traditional Day of Vietnams Electricity Industry (December 21, 1954 - December 21, 2025).Toan Thang

🔍 Key Information

📄
Tender Reference No.
526256337
📅
Publication Date
16 Dec 2025
🌐
Sector
Energy, Power and Electrical
📝
Notice Type
News
📍
Location
Viet nam

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 16 Dec 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Viet nam
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…