Energy, Power and Electrical

Energize Quang Tri Tender

📄 Tender ID: 526401318 📅 Published: 19 Dec 2025

📋 Tender Overview

(Chinhphu,vn) - National Power Transmission Corporation (EVNNPT), Central Power Project Management Board (CPMB) in coordination with related units have just successfully energized the Quang Tri 500 kV transformer station project and connection line (Quang Tri - Vung Ang - Da Nang branch). Panorama of the newly energized Quang Tri 500kV Substation - Photo: VGP/Toan ThangThe Quang Tri 500kV substation (TBA) project and connection line are invested by EVNNPT, CPMB manages and operates on behalf of EVNNPT, and Power Transmission Company 2 takes over operation. Quang Tri 500kV substation is built in Dien Sanh commune, Quang Tri province, away from the line. 500 kV Vung Ang - Da Nang exists about 2.5 km to the Northeast. The station has transmission voltage levels of 500 kV and 220 kV, transformer capacity includes 2 500 kV transformers with a capacity of 2x900 MVA installed outdoors, the first phase is pre-installed with a transformer with a capacity of 900 MVA. The 500 kV line connecting the 500 kV Quang Tri substation is connected to the 500 kV line Da Nang - Ha Tinh and Da Nang. The existing Nang - Vung Ang line includes branch A about 3.1 km long and branch B about 2.8 km long. The 220 kV line connecting the 500 kV Quang Tri substation is connected to the 220 kV Dong Ha - Hue line and the existing Dong Ha - Phong Dien line, including branch A about 3.2 km long and branch B about 2.9 km long. RELATED NEWS According to CPMB, the project implementation process inside In addition to favorable factors such as: The project received constant attention and direction from local authorities in Quang Tri province, and the support of the people whose project passed, so the project site was handed over to meet the schedule. Along with that is the regular, continuous, and timely direction of EVNNPTs leaders to remove problems. However, the project also faces challenges, especially during the construction phase when the regional weather in 2025 often has heavy rains, hindering construction progress. However, with the efforts of CPMB and the contractors participating in the construction, the project was completed and energized to meet the set schedule. After completion, the project ensures electricity supply for regional loads; release the capacity of power plants in the region into the national grid system; improving the reliability and safety of power supply to the regional power grid. Energizing the Quang Tri 500kV substation and connection lines is a practical action of EVNNPT and CPMB to welcome the 7th Vietnam Electricity Trade Union Congress, term 2025-2030; At the same time, we practically celebrate the 71st anniversary of the Traditional Day of Vietnams Electricity Industry (December 21, 1954 - December 21, 2025).Toan Thang

🔍 Key Information

📄
Tender Reference No.
526401318
📅
Publication Date
19 Dec 2025
🌐
Sector
Energy, Power and Electrical
📝
Notice Type
News
📍
Location
Viet nam

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 19 Dec 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Viet nam
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…