📋 Tender Overview
The duplication works of the departmental route 025 are developed with six simultaneous work fronts in an extension of 6 kilometers, mobilizing about 60 workers and machinery specialized in track in this strategic corridor that connects the Silvio Pettirossi International Airport area with the North Access (Py03 Route). The intervention, promoted by the Ministry of Public Works and Communications (MOPC), will directly benefit thousands of users of the metropolitan area, expediting circulation and road safety. Infrastructure and preparation of the land Current works include embankment conformation, placement of special parts and installation of drainage systems by double -meter double sewers by one meter. This infrastructure will properly channel surface waters and avoid flooding during rainy seasons. The works began on the site of the National Directorate of Civil Aeronautics (DINAC), where the transfer of the perimeter fence is also executed to release the intervention zone. New bridge on the Itay stream The central element of this phase is the construction of the new bridge over the Itay stream, where drilling and concreting pile work are already carried out. The structure will be 60 meters long and 18.5 meters wide, designed to house six vehicular lanes. The duplication of route D025 represents a key advance to improve the mobility, security and quality of life of all citizens of the metropolitan area, contributing to economic and urban development in its area of direct influence. Date: July 3, 2025