Transportation

Duplication Route D025 Tender

📄 Tender ID: 526968371 📅 Published: 03 Jan 2026

📋 Tender Overview

The duplication of Departmental Route 025 continues under the supervision of the Ministry of Public Works and Communications (MOPC), in the section between General Aquino and Sudamericana avenues, in the city of Luque. This intervention--fundamental to improving road capacity and safety in one of the strategic corridors of the metropolitan area--is developed simultaneously on different fronts, covering road, hydraulic and structural tasks, with the aim of optimizing circulation, reinforcing the drainage system and guaranteeing a more resilient infrastructure in the face of climate events. On the road front, the current work consists of preparing the subgrade base in the first return, located at km 0.3 on the left side, which will serve for the subsequent pavement structure. Likewise, the clearing and clearing of the second return, located at km 1.3, was carried out, preparing the area for the following phases of the work. Advance by sectors In the area of the Las Residentas Road Corridor, specifically in the viaduct, the installation of large diameter piles that are part of the foundations of the structure is being carried out. In parallel, in the sector close to the Air Force, the works on lined ditches corresponding to the Itay stream basin are progressing, which register an approximate progress of 70% and will contribute to adequate runoff of rainwater. Hydraulic works On Ytororo Street, window-type drains are being built that allow rainwater to be captured from the pavement and conveyed to double cellular sewers measuring 1.5 x 1.5 meters, which discharge into the Itay stream. In addition, filling, compaction and repair works are carried out in the vicinity of existing sewers, after which road work in the sector will continue. In addition, the placement of sewers continues at various points along the route, such as in the progressive 0+480, right side of Elizardo Aquino Avenue, where simple 1.5 x 1.5 meter cell phones are installed. These works began on Ytororo Street (km 0.2) and have already reached the aforementioned point. In turn, between General Bernardino Caballero and San Miguel streets, a double culvert of the same size is executed on the right side of the route. Finally, on the bridge over the Abay stream, the foundations have already been completed and both intermediate piers and one of the abutments have been loaded, leaving the formwork and loading of the last one pending. Subsequently, the filling and compaction work necessary to shore up the bridge slab will be carried out. Date: January 2, 2026

🔍 Key Information

📄
Tender Reference No.
526968371
📅
Publication Date
03 Jan 2026
🌐
Sector
Transportation
📝
Notice Type
News
📍
Location
Paraguay

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 03 Jan 2026
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Paraguay
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…