📋 Tender Overview
Hydrandine alert that abandoned cables expose users to danger due to electrical contact risk and delay modernization projectsThe large amount of disused telecommunications cables that occupy electrical structures represent a risk for population safety and in turn slow the accelerated advance of remodeling work of networks that are driven by hydrandine. This situation is not only an obstacle that goes beyond the technical, but users end up affected in a reliable service due to the delay of these modernization projects and the risk generated by these abandoned cables, as well as those that delay the execution of remodeling.
As explained by the electric power company, many of these networks have already fulfilled their useful life and must be urgently removed. However, the presence of formal operators wiring, in addition to informal suppliers that operate without authorization, makes the disassembly of deteriorated posts impossible.
Faced with this situation, Hidrandina has requested the withdrawal of these cables from companies, without obtaining a response. Faced with inaction, it has issued an ultimatum: if companies do not withdraw their facilities before the first semester of the year, they will proceed to forced disassembly, which could leave thousands of users without telephone and internet services. Despite the warning, breach continues.
This scenario not only delays the execution of a project that seeks to improve the safety and efficiency of the electrical system, but also shows the lack of control over telecommunications networks. Although companies have the right to use electrical structures with prior authorization, many operate clandestinely, further hindering the management of shared infrastructure.
It should be noted that according to the Ministry of Transportation and Communications (MTC), there is a term until March 2026 to deliver to the Environmental Evaluation and Control Agency (OEFA) the supervision reports on the use of posts by electricity and telecommunications companies.
Likewise, only Hidrandina has presented an action plan within the framework of this standard, which reflects its intention to adapt to the law and mitigate the risks derived from the disorder in the use of networks.