Infrastructure and construction

Deploying Construction 500kv Tender

📄 Tender ID: 525545875 📅 Published: 27 Nov 2025

📋 Tender Overview

On November 26, in Bac Ninh, the National Power Transmission Corporation (EVNNPT), the Northern Power Project Management Board (NPMB) coordinated with the local government of Chi Lang commune (Bac Ninh province) to organize the construction of the 500kV Bac Ninh transformer station project and connection lines. Representatives of the local government, EVNNPT and construction units perform the project construction implementation ceremony - Photo: EVNNPTThe Bac Ninh 500 kV Transformer Station (TBA) project and connection line is a special level energy project, Group B is invested by EVNNPT, NPMB manages and operates the project, Power Transmission Company 1 takes over and operates after completion. The project is built in Chi Lang commune, Bac Ninh province. The project has the main scale of building a new 500kV Bac Ninh substation with a capacity of 1,800 MVA, including 2 transformers, each transformer is 900MVA. On the 500kV side, 4 feeders are installed, on the 220kV side, equipment is installed for 13 feeders. The control, protection and measurement, communication and SCADA systems are equipped in accordance with the regulations of EVN and EVNNPT, complying with current rules and regulations. The connection line part will build two new 500 kV line sections, one circuit, about 0.31 km long (branch 1) and 0.49 km (branch 2) for transitional connection on the 500/220 kV Bac Ninh 2 line. - Pho Noi (existing). RELATED NEWSAt the same time, build two new 220 kV line sections, two circuits, about 0.38 km long (branch 1) and 0.23 km (branch 2) with transition connections on the 500/220 kV line Bac Ninh 2 - Pho Noi (existing). The project, after completion, meets the needs of power supply for urban areas, industrial parks of Bac Ninh province and loads in the area to promoting economic development and improving social security in the locality. EVNNPT representative said: Bac Ninh is a locality with rapid economic development and huge demand for electricity. Therefore, EVNNPT invests in the project to ensure electricity supply for the province as well as ensure regional energy security. EVNNPT representatives request relevant units during the construction process to strictly implement technical regulations, construction processes, ensure labor safety, environmental sanitation and construction quality. At the same time, it is necessary to strengthen coordination and mobilize maximum resources to accelerate progress and complete energization in accordance with the investors instructions. EVNNPT leaders also expressed their deep gratitude to the authorities and people of Chi Lang commune, Bac Ninh province for accompanying and supporting site clearance work, creating favorable conditions for the project implementation process. Affirming the consensus of the people is an important foundation for the success of the project, and at the same time wishes to continue to receive support and joint efforts from all levels of government and people in the next construction phase. As the investor, EVNNPT commits to implementing the project to ensure on schedule, quality, absolute safety, closely coordinating with localities in compensation, site clearance, and ensuring legitimate rights for the people. EVNNPT will also mobilize full resources and human resources, along with synchronous coordination between the Project Management Board and contractors to put the project into operation as soon as possible. Immediately after the Deployment Ceremony, the construction units immediately started leveling the project site - Photo: EVNNPT. The representative of the construction contractor pledged to focus resources to complete the construction on schedule and with quality, and at the same time wished to continue to receive support and close coordination from the authorities and people in the areas the project passes through, especially in site clearance work, to ensure a stable electricity supply schedule for the area. Toan Thang

🔍 Key Information

📄
Tender Reference No.
525545875
📅
Publication Date
27 Nov 2025
🌐
Sector
Infrastructure and construction
📝
Notice Type
News
📍
Location
Viet nam

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 27 Nov 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Viet nam
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…