Energy, Power and Electrical

Department Digital Radiography Tender

📄 Tender ID: 536672983 📅 Published: 23 Aug 2026

📋 Tender Overview

Facing the developments of storm No. 4 (NARRA), National Electricity System and Electricity Market Operation Company Limited - NSMO (Ministry of Industry and Trade) requires units to prepare operation plans, including proactively reducing the capacity of thermal power source clusters in Quang Ninh and Hai Phong areas in case of strong winds above level 9 to limit the risk of incidents. Download Map forecasting the path and affected area of storm No. 4 NARRA - Photo: National Center for Hydro-Meteorological Forecasting. On August 22, NSMO held a meeting of the Civil Defense Command to deploy plans to respond to storm No. 4 (NARRA). According to the National Center for Hydro-Meteorological Forecasting, at 7:00 a.m. on August 22, the storms center was located in the waters of Quang Ninh - Hai Phong, about 100 meters from Bach Long Vi special zone. 140 km North Northeast. The strongest wind near the center of the storm is level 8, with gusts of level 10; The storm moves westward at a speed of about 5 km/h. It is forecast that in the next 24-72 hours, the storm will maintain intensity level 8, shock level 10 and move slowly in the Northern Gulf of Tonkin. The danger zone is mainly in the North of the Gulf of Tonkin, natural disaster risk level 3. With this direction of movement, the storm can mainly affect power sources and power grids in Quang Ninh and Hai Phong. Faced with the above situation, NSMO requires units to continuously monitor the storms developments, ready to increase the force on duty to operate; Build appropriate operating methods for the national power system, mobilize reasonable sources, prioritize ensuring a safe, stable, continuous power system, meeting electricity needs for production and daily life. NSMO assigns the Dispatch Department to coordinate with the Electricity Market Operations Department to mobilize reasonable sources, regularly contacting power plants and transformer stations in the affected area. In case of strong winds above level 9, proactively coordinate to reduce the capacity of thermal power source clusters in Quang Ninh and Hai Phong to limit the risk of incidents; At the same time, review and postpone work on the power grid in the area affected by the storm when necessary. For the transmission system, NSMO requires the development of a power source operation plan to reduce capacity flow on 500 kV lines in the affected area in case of a strong storm of level 9 or higher. Mobilization of hydroelectric plants must strictly comply with reservoir and inter-reservoir operating procedures, ensuring project safety. NSMO requires Power Transmission Company 1 and Northern Electricity Corporation to ensure the readiness of equipment, plans, human resources and materials to promptly handle incidents. Information technology infrastructure, telecommunications, SCADA/EMS systems and backup power sources such as UPS and diesel generators must also be maintained in a ready and guaranteed state. Dispatching activities of the power system and operating the power market smoothly during the storms impact. NSMO assigned the Northern Power System Dispatch Center to monitor and report the operating situation, load and power grid at 7:00 a.m., 1:00 p.m. and 7:00 p.m. daily; At the same time, report immediately when an emergency situation arises. Anh ThoSee moreStorm No. 4, level 10, heavy rain in Quang Ninh and Hai Phong

🔍 Key Information

📄
Tender Reference No.
536672983
📅
Publication Date
23 Aug 2026
🌐
Sector
Energy, Power and Electrical
📝
Notice Type
News
📍
Location
Viet nam

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 23 Aug 2026
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Viet nam
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…