📋 Tender Overview
With the beginning of the school year the expected reconstruction of the station building will start at the Sokolnice-Telnice station. Its subject will be the complete restoration of the building with an emphasis on the revitalization of the historic facade. The construction work will last 15 months and will be carried out by Hro stavby Morava at a price of CZK 47.9 million without VAT.The reconstruction will include rehabilitation of damp masonry replacement of windows and doors insulation of the building and restoration of the original appearance of the facade including installation of decorative elements. Part of the trusses and roofing will also be replaced. As part of the layout changes new public toilets will be built and a new area for refreshments will also be created. The entire building will be renovated with water distribution electrical installation and heating.The building and outdoor areas will be equipped with new furniture in the form of benches baskets bike racks and connections for charging e-bikes. An orientation voice beacon and tactile labels will be used to orient the blind. The existing seven residential units will also undergo renovation which will then be offered for rent. Passenger services will be provided in replacement premises during construction. The cash desk and waiting room will be located in the modified original apartment and the public toilet in the mobile cells.The construction will be co-financed by the European Union from the Recovery and Resilience Instrument RRF. The Railway Administration expects to use the amount of almost CZK 2.4 billion through this instrument within the framework of the reconstruction of a total of 35 station buildings. These are for example buildings in Karvin Blina Krsn Lpa Svtl nad Szavou or Ronov pod Radhotm. The goal is to reduce the energy demand of buildings and increase comfort for passengers. The average rate of co-financing should reach approximately 70 percent.