Building Infrastructure and construction

Czech Republic Negotiations Tender

📄 Tender ID: 466506162 📅 Published: 16 Oct 2021

📋 Tender Overview

Representatives of the Railway Administration the municipality of Prevsov and the public advanced to the final stage within the negotiations of the working group on the station building in Prevsov. The railway administration examined various possibilities of its preservation and other alternative lines of the modernized line in the vicinity of the building. At present there are three variants of a possible solution two of which provide for the preservation of the building.At present it is possible to sell the building to a municipality or another entity for a price determined by an expert opinion which reaches 9.3 million crowns. The second option is to rent the building for an amount that covers operating costs and routine maintenance thus enabling the building to be maintained. The third option is still to route the route through the existing station explains Jan Benes chief construction engineer from the Railway Administration.At the last meeting of the working group in Prevsov it was agreed that the municipality will discuss the possibility of buying the building at a meeting of the council and the Railway Administration will present its idea of the amount of rent for the ground floor of the building. The option of renting a building is a way to meet the needs of the municipality the public and especially the existing tenants who live there. However the railway administration needs a guarantee that the building will have further use. Given that the operation of trains would take place in its immediate vicinity it is necessary to find a suitable purpose that will continue to fulfill.After the Railway Administration informs us of the amount of rent further negotiations will take place at the council. At the same time however it is necessary to remind that the search for a solution cannot lie only in the municipality. More than 1200 people signed the petition to preserve the building. If they found a new civic association which will rent the ground floor of the building for a long time and breathe new life into it it could be a solution to the whole situation believes the mayor of Pevov Miroslav Podneck. At the same time he adds that there is still the possibility of demolishing the station building at play Nobody in the village or in its management wants it. On the other hand it is still a better option than for it to fall into disrepair after a few years because the municipality will not have it for its maintenance or for a private person to buy it and make a hostel in it . At the same time the Railway Administration introduced other modifications to the route in the vicinity of Pevov which enable the building to be maintained and at the same time minimize the need to reduce the line speed. The original drop of the maximum speed of express trains around Pevov from the planned 140 km h to approximately 105 km h would lead to their delay by approximately half a minute and increase the energy intensity of railway transport in this section by 75 MWh per year. The new variants make it possible to reduce the drop in line speed to 120 km h or 130 km h in the event that the line leads in the immediate vicinity of the station building. They also respond to other allegations that the municipality had against the original proposal such as the relocation of the level crossing.

🔍 Key Information

📄
Tender Reference No.
466506162
📅
Publication Date
16 Oct 2021
🌐
Sector
Building
📝
Notice Type
News
📍
Location
Czech republic

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 16 Oct 2021
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Czech republic
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…