Renewable Energy

Czech Republic Easier Tender

📄 Tender ID: 515766708 📅 Published: 13 Mar 2025

📋 Tender Overview

At the proposal of the Ministry of Industry and Trade and in cooperation with the Ministry of the Environment and the Ministry for Regional Development, the Government approved the Act on Acceleration of Renewable Energy Resources (RES). The new legislation brings further simplification of permitting processes for the construction of solar and wind power plants, especially through the definition of areas for accelerating the use of RES so -called acceleration areas. Thanks to streamlining the approval process, these zones will allow faster project implementation. The definition of areas will take place at three levels according to their importance and each acceleration zone will have a territorial measure that sets out detailed conditions and criteria for construction.

Says Minister of Industry and Trade Lukas Vlcek, saying that state authorities, local government and local public will cooperate to identify these zones and preparation of specific projects. The main novelty of the Act is the introduction of acceleration areas in which the projects of photovoltaic and wind power plants will be approved in a simplified regime. In these zones, projects that meet the conditions of the Directive on the promotion of the use of renewable energy sources will not be subject to, inter alia, the environmental impact assessment (EIA), which significantly speeds up the process. However, this does not mean that the projects will be approved automatically. The potential impacts of wind and solar power plants will be assessed in the phase of defining acceleration areas based on the requirements for the protection of other public interests, as well as biological assessment, and comprehensive evaluation of the effects of acceleration areas on the environment (so -called SEA). In acceleration areas it will be possible not only to allow new electricity factory, but also related infrastructure, such as connection to distribution and transmission systems, energy storage systems, transport and technical infrastructure, and measures to mitigate impacts such as noise barriers.

The definition of acceleration areas will take place at three levels - local importance will be determined in the territorial plans of municipalities, extreme importance in the principles of territorial development of regions and nationwide importance in the zoning plan. The proposal of legislation determines other tasks for individual entities, including the General Ministry, ie the Ministry of Industry and Trade, the Ministry of the Environment and the Ministry for Regional Development. added Minister for Regional Development Petr Kulhanek. Complements the Minister of the Environment Petr Hladik.

The electricity manufacturer operating a wind power plant will pay a fee of 50 crowns/MWh, from which the local municipality will receive 98 % and the rest of the administrator, for example, the municipal authority with extended powers. This fee was set on the basis of the expected use time of the power plant 2250 hours per year and the amount of CZK 100,000 for the installed MW. The main objective is to motivate investors to build wind power plants in places with higher windy, which will lead to maximizing the use of installed power. The fee will also strengthen cooperation between investors and local municipalities. stated by the Chairman of the Chamber of RES Stepan Chalupa.

The new law ensures the transposition of the revised Directive on the promotion of renewable resources approved in 2023. The Czech Republic also its already established measures and other measures prepared in the field of permitting processes for the RES are among the most active EU Member States.

🔍 Key Information

📄
Tender Reference No.
515766708
📅
Publication Date
13 Mar 2025
🌐
Sector
Renewable Energy
📝
Notice Type
News
📍
Location
Czech republic

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 13 Mar 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Czech republic
State / UT N/A
Tender Type Procurement News
Currency Vijay98
Similar Tenders
Loading similar tenders…