📋 Tender Overview
Intervention includes hot asphalt placement and cracks repair on the landing floor. Works were suspended by heavy rains.The Peruvian Corporation of Airports and Commercial Aviation (CORPAC), an entity attached to the Ministry of Transportation and Communications (MTC), resumed the maintenance works on the landing floor of the Fernando Belaunde Terry airport in the city of Jaen, after the heavy rains recorded in the area prevented its continuity during the last three months.
The works, which are executed under specialized technical conditions, will culminate in approximately 30 days. At the end of these tasks, it can proceed with the reprogramming of commercial flights from and to said air terminal.
As established in the technical file, the works include the maintenance of the drainage system, through an agreement with the Municipality of Jaen, the placement of 4 -inch hot asphalt (10 cm) thick in various areas of the landing floor; in addition to the treatment and specialized seal of cracks and cracks existing in said airport infrastructure.
These actions seek to guarantee optimal safety and operability conditions for aircraft that use this important air terminal in the country.
While the works last, the airport will remain closed to air traffic. Corpac thanks the understanding of users and reaffirms their commitment to operational security and the strengthening of national airport infrastructure.