📋 Tender Overview
Regarding the situation of damage caused by typhoon No. 5, until 16g on August 27 on roads across the country, traffic congestion at 49 locations and reports of the Vietnam Road Administration said. Currently, the forces are trying to relieve the congestion area to re -open the national highway today. Police forces, militia and road management units clean up on the bypass route of Highway 1 - Photo: Newspaper built 49 congestion locations on the road will connect tonight in which, Thanh Hoa province has 25 locations including: 19 flooded locations and 6 positive tales. There are 4 flooded positions on the national highway, 6 positive tales; Local roads 15 flooded locations. It is expected that until 20 oclock today (August 27) will open the traffic. The Table of Nghe An province is congestion 21 positions including 4 flooded positions and 17 taluy landslide locations. Including 1 flooding point (QL15) and 6 score of Taluy is congestion (QL.16, QL.48); Local roads 3 flooded locations and 10 landslides. It is expected that until 22:00 today will clear the traffic. Of which 1 point flooded on Highway 12B; Local roads 2 flooded locations. These positions have been cleared from 17h today. In the flooded position, the landslide, the road management areas and the Department of Construction directed the contractor to set up a warning sign and arrange traffic operators 24/24 hours. Currently, on national highways, highways and provincial roads, there are still scattered rains, the Vietnam Road Administration will continue to update, review and statistics in the next reports. The current maritime area has not recorded damage caused by storm No. 5. Heavy rain made the only road to Huoi Thum village, Na Ngoi commune was damaged - Photo: Hai Thuong iron is waiting for the water to remove the railway area, according to the report of the Vietnam Railway Corporation: Hanoi - Lang Son Railway Km80-81, KM95 due to heavy rain flooded with rail, rocky soil into the railway, the unit has been on duty, and the road has been latched, the road has normal speed; Hanoi - Ho Chi Minh City Railway Railway due to heavy rain in Hanoi Station, Giap Bat station flooded with flooded information equipment, the unit waiting for the water to recover to restore the repair. The railway at Km147 is flooded with the top of Ray, there is no phenomenon of withdrawal. Local flooding in the S1 rolling road has been resolved, normal exploitation activities. Dong Hoi aviation is normal operation. Construction activities at the port have been operated again from this morning. Tho Xuan Airport, Dong Hoi is normal after typhoon No. 5. Vinh Airport has restored the construction and repair activities to continue to respond and review areas at risk of landslides on the opening of electricity No. 147/CD-TTg dated August 25, 2025 and Council No. 148/CD-TTg dated August 26, 2025 of the Prime Minister on focusing on the stormy and stormy results on August 27 Speeding electricity requires agencies and units to urgently perform the following tasks: The Vietnam Road Administration directs its affiliated units to continue to focus on inspecting and reviewing areas at risk of flooding, landslides and flash floods for a plan to handle and divide the traffic flow. send people to guard, plug in the float, barrier, signal in the locations of the road that is flooded deep, underground, the road is broken, the road section is eroded ... resolutely does not allow people and vehicles to pass through when there is a risk of unsafe, for landslides, large sliding sliding causes traffic congestion to direct the management and maintenance units to the maximum of the plan to implement the plan, the maximum of the plan, the maximum of the plan to implement the plan, the maximum of the plan, the maximum of the plan to implement the plan, the maximum of the plan to implement the plan Equipment and human resources are available in the area to ensure traffic in the fastest time. Note to ensure safety for forces and means to participate in the troubleshooting of the floods on the traffic routes. Dynamic, ready to support and coordinate with the Department of Construction of localities with national highways being urgently congestion, ensuring the fastest time, especially on the main traffic axes. key points such as: bridges and weak roads are flooded; The area often occurs, the steep passes often have falling rocks, land, rail areas on the downstream side of the dyke, irrigation dams, reservoirs. SiteCho stops, ships, increases, conveys passengers when the situation of floods causes flooding and sliding in the area where the ship has to stop. Vietnam maritime and waterway roads, Vietnam Maritime Safety Corporation urge management units to manage, maintain thread, urgently review and statistics of floats, signal lost, drifted caused by storm No. 5; promptly re -deploy the system of floats, signal immediately after the floods. Dear affiliated units, units that manage and maintain routes regularly inspect, review and request water vehicles not anchoring areas near the works crossing the river; Regularly monitor the situation if the vehicle is detected in time, it must promptly notify the authorities to handle. Vietnam aviation is closely monitored the weather changes in the area affected by storms and floods to adjust or change the flight schedule accordingly to ensure absolute safety of flight operations. Directing units to strengthen airport, station, communication system, operating and flying command to promptly detect and handle incidents. The construction of localities in the area affected by natural disasters coordinates with all levels, local branches, road management areas and units of road, railway maintenance, railway, railway, railway, railway, railway, railway ensure traffic on roads and waterways assigned to manage; Coordinate with the road, rail, maritime and water industry in the operation of transportation, increase the board, convey passengers and goods