Transportation

Comprehensive Assessment Investment Tender

📄 Tender ID: 534038061 📅 Published: 13 Jun 2026

📋 Tender Overview

The North-South Expressway projects in the East that have been invested and put into operation have increased traffic capacity, reduced collisions and traffic accidents, while promoting socio-economic development and strengthening connections between localities and economic regions. Download The investment and operation of the Eastern North-South Expressway has contributed to improving transport capacity and strengthening traffic connections between localities. According to a report by the Vietnam Road Administration, up to now, the country has put into operation and technically opened about 3,345km of expressways; In the 2021-2025 period alone, about 2,182km have been completed and put into operation. On the Eastern North-South Expressway, 36/39 sections with a total length of about 1,914km have been put into operation (including temporary exploitation), of which the Vietnam Road Administration directly manages and exploits about 1,296km. Initial research results show that the investment and operation of the route has been put into operation. The North-South Expressway in the East has contributed to improving transport capacity, strengthening traffic connections between localities and economic regions and gradually promoting the effectiveness of investment in road traffic infrastructure. Improving transport capacity, enhancing traffic connection In addition, traffic management and electronic toll collection systems belonging to component projects in the 2017-2020 period have been put into operation since March 2, 2026. During the period from March 2 to May 31, 2026, the system recorded more than 9.7 million vehicle movements, collected over 944 billion VND in expressway use fees paid to the State budget; The synchronous implementation of the traffic management system and electronic toll collection has contributed to improving the efficiency of route management and operation, increasing publicity and transparency in toll collection and gradually forming a database to serve modern traffic management. RELATED NEWS Milestone to complete the toll collection system and ITS on the North-South expressway before September 15Proposed to upgrade more than 80km of Cao Lanh - Rach Soi expressway this quarter I/2028 Proposing a specific mechanism for investment in expanding the North - South Expressway. Through coordination with the Traffic Police Department to adjust lane division plans and traffic organization on some key expressways, traffic congestion and accidents have been significantly reduced. Evidence of monitoring results shows that the number of collisions on some routes decreased by 70-80% compared to before the adjustment; Circulation time is shortened by about 20-30%; Passenger capacity has been significantly improved, contributing to reducing transportation costs and improving the efficiency of project exploitation and ensuring traffic order and safety. On the Eastern North-South Expressway, there are currently 7 fully invested rest stops (Gie-Ninh Binh, Cao Bo-Mai Son, La Son-Hoa Lien, Deo Ca Tunnel, Ho Chi Minh City-Long Thanh-Dau Giay, Ho Chi Minh City-Trung Luong, My Thuan-Can Tho). There are 18/19 remaining stations being deployed, of which 9 stations already have essential public service works put into service; 3 stations are being operated based on the existing temporary station model; 6 stations do not have public services, people are temporarily using adjacent stations or neighboring service areas at intersections; one station is waiting for site clearance. Confirming that the work of receiving, managing, operating and maintaining the route sections has been proactively and promptly implemented by the Vietnam Roads Department. According to the Vietnam Roads Department, problems and defects arising during the exploitation process are reviewed, detected and required investors and contractors to carry out warranty responsibilities according to regulations. At the same time, the Vietnam Roads Department has compiled difficulties, obstacles and lessons learned from the exploitation process. exploitation to serve the management and operation of projects in the next phase. Continuing to comprehensively evaluate the efficiency of exploitation, the Vietnam Road Administration believes that initial research results show that the North-South Expressway in the East has basically met the requirements of exploitation, gradually promoting its role as a national lifeline, contributing to improving transport capacity, reducing logistics costs, enhancing regional connectivity, serving the travel and goods transport needs of people and people. businesses, promoting socio-economic development; Management, operation, traffic organization and provision of operational support services on the route are gradually being completed, contributing to improving the efficiency of project exploitation. However, a comprehensive assessment of the routes operational efficiency needs to continue to be researched and reviewed on the basis of fully updated data on traffic flow, traffic safety, operational management, socio-economic efficiency and related contents. In the coming time, the Vietnam Road Administration will Continue to coordinate closely with the Academy of Strategy, train construction staff to fully evaluate the effectiveness of operating the Eastern North-South Expressway, and report to the Ministry of Construction before June 20, 2026 on time as required. Previously, chairing the meeting on the implementation of investment preparations to expand sections of the Eastern North-South Expressway, the Minister of ConstructionTran Hong Minh agreed on an investment research plan to expand the limited 4-lane Eastern North-South Expressway to 6 lanes according to planning, ensuring synchronization and long-term, limiting the need to continue expanding multiple times, wasting time and resources, affecting the exploitation process of the entire route. Minister Tran Hong Minh requested the project management bo

🔍 Key Information

📄
Tender Reference No.
534038061
📅
Publication Date
13 Jun 2026
🌐
Sector
Transportation
📝
Notice Type
News
📍
Location
Viet nam

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 19 Jun 2026
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Viet nam
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…