📋 Tender Overview
The Ministry of Construction requires the PMU to complete the smart transport system on the highway before October 31, 2025. The Ministry of Construction requires the PMU to focus the maximum resources, accelerate the construction and installation of the system of monitoring and supervision equipment, electronic charges without stopping, ensuring synchronous completion with the entire North -South Expressway in the East period 2021 - 2025, ready to operate the fee collection from January 1, 2026, the construction of the project management boards, the United States, the United States, the United States, the United States, the United States, the United State Vietnam Road Administration; The Department of Economic - Construction Investment Management requests to accelerate the implementation of the system of monitoring, traffic management, electronic charges that do not stop and control the vehicle load of the North -South Expressway project in the East period 2017-2020 and 2021 - 2025. According to the Ministry of Construction, the investment progress of these items is still slow compared to the previous direction of the Ministry leaders. Therefore, the Ministry requires the PMUs to maximize resources, accelerate the construction, installation of system of monitoring and supervision equipment, electronic charges, not stopping, ensuring synchronous completion with the entire North -South highway in the East period 2021 - 2025, ready to operate the fee collection from January 1, 2026. into the traffic monitoring system before the construction of the project, the construction of the project, the construction of the project, the construction of the project, the construction of the project, the construction of the project, the Ministry Request PMUs to commenced bidding packages to supply and install equipment before June 15, 2025; Complete the monitoring system before October 31, 2025; Test operation, handover and put into operation before December 31, 2025.Tin related to the software bidding package shared at Phan Thiet - Dau Giay project, the Ministry of Property Thang Long PMU has completed the software installation for all 5 component projects from the beginning of August 2025 and completed before October 31, 2025. Preparation and lessons to complete the bidding documents for bidding packages in the period of 2021 - 2025. Along with that, synthesize data on equipment price and software as a basis for reference for the next bidding packages. Ask to shorten the schedule of delayed time compensation for component projects in the period of 2021 - 2025, the Ministry requires completion of the design dossier of the establishment and implementation of the specialized design agency; Complete appraisal, approval, contractor selection, contract signing and start in June to July 2025, depending on the type of bidding package. Shared, ensuring synchronous settings for 12 component projects in phase 2. For the back-end system and the road and road transport database system, the Ministry of Construction assigns the PMU 7 to complete the basic design dossier before June 15, 2025, submit the appraisal and approve in June 2025, start construction and complete before October 31, 2025, operate, run and deliver in the end Nam cooperated with the PMU 7 to unify the system model, technical requirements of the main equipment, location, scale, plan to build an executive center and data centers to ensure investment efficiency and serve the operation of operation in the future. Construction emphasizes: Investors, PMUs, relevant agencies are responsible before the Minister, if they continue to meet the progress, they do not meet the progress. Reason responsibility for related organizations and individuals .Phan Trang