Railways

Comfortable Train Travel Tender

📄 Tender ID: 524255001 📅 Published: 24 Oct 2025

📋 Tender Overview

23/10/2025 Comfortable rail travel from Chorzow through Bytom to Naklo and Tarnowskie Gory. Travelers are already benefiting from the effects of the works carried out between Chorzow Batory and Naklo Slaski. The investment improved travel and goods transport conditions. Better train journeys are provided by the new Chorzow Unii stop and the convenient Chorzow Miasto, Bytom and Radzionkow stations. The project, worth PLN 1.5 billion, is co-financed by the EU FEnIKS program. The works on the railway line 131 Chorzow Batory - Bytom - Naklo Slaskie are nearing completion and are a good opportunity to summarize the large investment worth PLN 1.5 billion. Its effect is more efficient, safer and more comfortable rail travel on the route from Katowice to Tarnowskie Gory and Lubliniec. Between Chorzow Batory and Naklo Slaski, we replaced the tracks, turnouts, traction network and railway traffic control devices. Additionally, the third track on the Chorzow Batory - Chorzow Miasto route increases the capacity of the railway line. From the new timetable, passenger trains will reach speeds of up to 140 km/h. The travel time of trains between Chorzow Batory and Tarnowskie Gory will be shortened by approximately 7 minutes. From December 15, regional trains will cover this route in 31 minutes, which took over 38 minutes before the investment. Thanks to the works carried out by PLK SA, access to railways in the province has increased. Silesia, safety in rail, road and pedestrian traffic has improved, and longer and heavier trains can travel more efficiently. Modernization was also important for the development of an important freight route connecting Silesia with sea ports. The increase in line capacity will allow more goods to be transported by rail. The Bytom station has undergone a major transformation. We have equipped three platforms with benches, bright lighting and a sound system. We installed displays with data on train arrivals and departures and info kiosks with timetables. Modern solutions make it easier to navigate while traveling. The original diamond pattern of tiles has been preserved on the platform surface. Two passages under the tracks provide convenient and safe access to the platforms and the other side of the city. Access to the trains is provided by elevators. Additionally, the aesthetics of the tunnels has improved. Murals, i.e. large-format wall paintings, covered the walls in the buildings and refer to the history of the railway, the city and the region. In addition to railway and historical curiosities, there were also drawings about local flora and fauna. The murals were made by Mona Tusz, whose artistic expression positively changed the aesthetics of the passages under the tracks and made waiting for the train more pleasant. The platform hall has a new roof made of zinc-titanium sheet and historic glazing. Its structure was previously reinforced. New LED inscriptions with the name of the station appeared on the glass facade of the facility. The solutions used allowed for additional illumination of the platforms and the reconstruction of the historic character of the Bytom station. The works were carried out in accordance with the arrangements with the Provincial Conservator of Monuments. We have not forgotten that the Bytom hall is also a witness to history. Visible effects of war were left on the structure of the facility, such as a dent in the span after a bomb and bullet holes. From the modern Bytom Local Control Center, traffic dispatchers ensure the safe operation of trains on the section from Chorzow Miasto to Radzionkow. The track system was designed taking into account the historic gate signal box, which has regained its splendor and once again became the stations showcase. Passengers also use comfortable platforms at the Bytom Karb and Bytom Stroszek stops. Positive changes have taken place in Chorzow. Passengers gained better access to trains from the new ChorzowUniversity stop. Access to the platforms leads from the newly built and safe underground passage along ul. Bytom Riflemen. The reconstruction covered the entire communication system from ul. Strzelcow Bytomskich by connecting ul. Glogowska from ul. Zabrska, where a new railway viaduct was built. The construction of a collision-free intersection at the rail level crossing increases the safety of rail travel and improves communication in the city. The new solution shortens the travel time to the other side of the tracks - without having to wait at a rail-road crossing. We rebuilt the Chorzow Stary and Chorzow Miasto stations and built a new railway viaduct over ul. Florianska. It is from there - by stairs or elevator - that you can get to the new platforms of the Chorzow Miasto station. The effects of the work in Radzionkow are also visible. Passengers have access to new platforms that improve service at the Radzionkow station and the Radzionkow Rojca stop. We built a railway viaduct at ul. Kuzaj. Cars drive on the new road, there is also a pedestrian and bicycle path. As a result, safety in rail and road traffic has improved. After reconstruction, the viaduct at ul. The Zejera has gained larger and wider ground clearance, which improves road communication. The street under the viaduct has been supplemented with a pedestrian sidewalk. The facility also has a new structure, which allows heavier trains to pass. Drivers use the road under the railway viaduct that we built at ul. Saint Wojciech. The facility replaced the level crossing, which increased safety in rail and road traffic. The new solution improved road communication and shortened the travel time to the other side of the tracks, without having to wait at the crossing. Completion of all works on the line is planned for the end of 2025. The investment value is approximately PLN 1.5 billion net. The funding comes from the EU Program European Funds for Infrastructure, Climate, Environment 2021-2027 (FEnIKS). Investment in numbers: 4 stations and 2 stops, 2

🔍 Key Information

📄
Tender Reference No.
524255001
📅
Publication Date
24 Oct 2025
🌐
Sector
Railways
📝
Notice Type
News
📍
Location
Poland

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 26 Oct 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Poland
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…