📋 Tender Overview
The National Institute of Roads Invas is allowed to report thatOperational personnel and machinery continue to work on the recovery of the road that connects the municipality of Onzaga with San Joaqun in the department of Santander which has been closed since May 31 due to the loss of banks at kilometer 76 due to growing sudden riverSince the emergency arose Invas has taken different actions with the contractor and the inspectorate to stabilize the mountain open a passage and recover the road as soon as possible however weather conditions have made the works difficult.In the last few hours a new landslide was recorded that completely destroyed the works that technicians and operators had been carrying out in the emergency sector.Currently the lower slope is being stabilized with river crude up to the level of the road to recover the material lost in the landslide. Likewise the number of dump trucks was increased to ten 10 to remove material quickly.Similarly a group of specialists who traveled to the area to assess the magnitude of the emergency will deliver the results of the studies and the possible final solution in the coming days to guarantee the stability of the slope reconstruction of the bank and other actions that allow the passage through this route to be enabled again.