📋 Tender Overview
Sixteen months ahead of schedule the excavation of the left road of the Amag Tunnel located in this municipality in the Southwest of Antioquia was completed which marks a milestone in the work that is part of the Pacfico 1 project concessioned by the National Infrastructure Agency ANI.Precisely the culmination of the 3600 meters of excavation anticipated the stall or meeting of the two work fronts and the completion of the excavation of the right road is expected for next June.The Amag Tunnel is a work that will bring great benefits for Antioqueos in terms of mobility and competitiveness With this it will make it possible to strengthen trade the main engine of the regional economy and at the same time reduce travel time and operating expenses for vehicles said Angela Mara Orozco Minister of Transportation.The tunnel is key to facing the mountainous geography of the region and will directly benefit the inhabitants of the municipalities of Venecia Amag Titirib Caldas and in general the entire Southwest of Antioquia Medelln and the department of Choc. In the excavation of this infrastructure which will also bring important benefits to the region and the country around 1100 people have worked for more than two and a half years.The construction system used for the excavation of the double tunnel corresponds to the traditional drill and blast system. In this sense an adequate management of rock stability was maintained throughout this phase. In addition the protection of the flora and fauna existing in the area was guaranteed.ngel Gabriel Bedoya works as a construction officer in the Amag Tunnel and is one of the workers who has been in this construction since the beginning. I have been since they began to drill the mountain and I am part of this great team. With these large infrastructure works a lot of employment has been generated and there are many families that have gotten ahead he explained.This is also confirmed by Nataly Zapata administrative head at the Amag Tunnel noting that she always wanted to work on the project because she knew that she had many opportunities to grow professionally and give her family a better quality of life. I am happy to be part of a project that will bring many benefits to the community because it has generated a lot of employment here in the Amag region he said.For his part lvaro Mesa HSQS Director of the tunnel explained how users will have works of excellent specifications. The main benefit will be to have fast connectivity to have a very safe road and to be able to provide comfort to users who travel through this road corridor he said.